Gateway BP(1.3)-CS 980924 (2)FILE
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: G~tewav_ Business Park. R~_ lat allot 2. Block 1 and Common ,4rea 1 and Site
~ to allow the creation of a new lot and the development of a
150,017 sf office/warehouse facility on approximately 8.3 acres of property
located at the southwest corner of Gateway Blva~ and S. Freeport Parkway, at
the request of Halff ,,lssociates, Ina
DRC DATE: September 24, 1998 and October 1, 1998
CONTACT: Mike Martin, P.E., ,4ssistant City Engineer 004-3679)
COMMENT STATUS: ,~PRELIM1NARY
The proposed fire protection waterline needs to be private. Also, the fire hydrant
spacing must be approved by the City's Fire Marshal.
As per the City's streetscape plan, an 8' wide brick paver band needs to be provided
for the driveways on Freeport Parkway.
The utility plans are too light in color, so please resubmit plan for review.