WA9302-CS 920413GINN & CASE, INC.
April 13, 1992
CONSULTING
ENGINEERS
Mr. Steve Goram
City of Coppell
P. O. Box 478
Coppell, TX 75019
RE: Future Pump Station Site
Dear Steve:
A preliminary review of the water system master plan prepared
by our firm in February, 1991 indicates that there are three
potential sites which could be considered.
The first is the Hackberry location as shown on the original
plan. A second site that should be investigated is at the
location at MacArthur and Beltline Road. The third site
could be in the vicinity of Beltline/Beltline/Denton Tap. This
final site would require more extensive off-site pipelines to
.service the location.
We will be happy to meet with you further on these sites after
you have had time to check out their availability.
Sincerely,
~~e~G~ ~ ~
H. Way e Ginn, P.E.
emg
Q~c~: Ken Griffin
17103Preston Road · Suite l(}(} * Dallas, Texas75248 ® Phone 214/248-4900
P.O. Box 796577 ® Dallas, Texas 75379-6577 ® FAX 214 / 931-1452