Loading...
WA9302-CS 920413GINN & CASE, INC. April 13, 1992 CONSULTING ENGINEERS Mr. Steve Goram City of Coppell P. O. Box 478 Coppell, TX 75019 RE: Future Pump Station Site Dear Steve: A preliminary review of the water system master plan prepared by our firm in February, 1991 indicates that there are three potential sites which could be considered. The first is the Hackberry location as shown on the original plan. A second site that should be investigated is at the location at MacArthur and Beltline Road. The third site could be in the vicinity of Beltline/Beltline/Denton Tap. This final site would require more extensive off-site pipelines to .service the location. We will be happy to meet with you further on these sites after you have had time to check out their availability. Sincerely, ~~e~G~ ~ ~ H. Way e Ginn, P.E. emg Q~c~: Ken Griffin 17103Preston Road · Suite l(}(} * Dallas, Texas75248 ® Phone 214/248-4900 P.O. Box 796577 ® Dallas, Texas 75379-6577 ® FAX 214 / 931-1452