Loading...
Gateway BP(1.4)-CS 960613 (2)The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 June 13, 1996 Charles Schmidt, Project Manager Haverty Furniture Companies, Inc. 866 West Peachtree St., N.W. Atlanta, GA 30308-1123 RE: Gateway Business Park, Replat of Block 2 (Havertys Furniture) Development Fee Assessment Dear Mr. Schmidt: Enclosed is a copy of the City of Coppell development fee assessment list, along with a copy of the development fee calculations for Gateway B~slness Park, Relflat of Block 2 Havertys Furniture. Please make payment to the City of Coppell in the amount of $11,925.00 and forward to Jennifer Armstrong, Finance Director, along with a copy of the Fee Assessment list. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. The final disposition of the Roadway Impact Fees will be by separate letter. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griff'm, P.E. Assistant City Manager/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official CITY OF COPPELL DEVELOPMENT FEES Date: Project: June 13, 1996 Gateway BuSiness Park, Replat of Block 2 (Haverty's) TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee 200.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 195.98 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 30.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 7,470.38 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Roadway Impact Fee waiver request has pending (100% due prior to Council Approval) been submitted Construction Inspection Fee need submittal of -0- contracts TOTAL $19,956.36 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 11,925.00 I * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL ENGINEERING Y~EHORANDUN DATE TO: FROH RE: June 6, 1996 Mike Martin, Assistant City Engineer Matt M. Cast, Superintendent of Public Services Development Fees for~ The following fees should be assessed and collected on referenced project. Water Impact Fee: 1 - 2" Domestic Meter/s = 8 ESU's 1 - 2" Irrigation Meter/s = 8 ESU's 1 - 10" Fireline Meter/s = 2.5 ESU's Total 18.5 ESU's @ $450.00 ea = $ 8,325.00 100% due prior to Council approval of the final plat. the above Wastewater Impact 1 - 2" Domestic Meter/s = 8 ESU's Total 8 ESU's @ $450.00 ea = $3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections ~ $50.00 each = $200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1 Connections @ $50.00 each = $50.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots ~ $ 50.00/lot = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 2" Domestic Meters ~ 195.98 = $195.98 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee 1 - 2" 2 - t0" (Irrigation/Fireline) Irrigation Meter/s ~ Fireline Meter/s ~ $ $~95.98 ea = $195.98 3,637.20ea. = $7,274.40ea.. Total $7,470.38 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) t Meters ~ $30.00 ea = $ 30.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters @ $35.00 ea = $35.00 100% due prior to issuance of water meters. Sa verty' s ESCROW / ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Gateway Business Park, Replat of Block 2 (Havertys) 4112196 ROADWAY IMPACT FEE: Ca!¢gory ** ! ~nd Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** F~ per Vehicle Mile Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee ]~er Vehicle Mile) 9 General Light Industrial 270,675 270.675 $3OO $86,074.65 * (Figure 2 - Roadway Impact Fee Sw_dy) ** (Table 3 - Roadway Impact Fee Study) PENDING FINAL DISPOSITION WILL BE BY SEPARATE LETTER