Gateway BP(1.1)-CS 900816 OAT,-.V~A~ BU,BLN~ESS PARK
i~ AUG , 71990 · S[-~c Meetin8 ' ThursdaY, August !6, 1990
..~ '10:30 a.m.
Wayl~nd ~read~l Cate~ D~clopmen, Co~oradon
~soc~aes, Inc.
George Pralt ~bett H, Ha~ ' "~
~ Stuffieb~am .~bc~ H, H~>~ ~so~iat~s, Inc.
BiD Jone~ L.H. ~' Cnmp~y (La~')
C~I Malay ~mtraction Co, (M~ay)
~ Da~ ~D of Coppell (Coppe~)
the 12" bore at Cotton Road was off.ual about one [i) foot below the desi~led fio~ue of
the water ~e. ~ey ~ere tqing to 8o strM~t ~to ff;e e~sting 12" wot,. · :~n the other
side w~ch lcd to them hitt~8 the storm sewer.
Just w:mted to em~kas~e to compact !i~; around th~ manholes be~a~
fora c~n,':, .~.'. ~s close as they need ~he compaction.
It is being done.
We just have not seen it being done. Te~a-Mar was notified to rake densh~es around
the ma~.ole~.
Coppe~:
I have a concern over the amoum of open ditch cu~entiy on the ske bec,~:';c of
s~e~' and protection o~ wha~ the contractor has instated. I wo~d lik~ for ?u re.
to see ff there is a problem be~een the contractor and the lab [mpecmr. App.," ::~;:;
~ a ~e lapse between when ~e ~ffs ~e completed and the d~nsi~ies are token. ~-. there
~y way that the !ab teehnie[~ co~d speed i~ up? '
N ~ere is any deflection of the ! 2" 'water pipe ~ the encasemem, ~st the deflection
ca~ot exceed the manufac, urer's specificafivm, and we need to consider pressure
to prevent ~he leoser~g of the joints. ~e bc>~mg sepe~,~ser has assured me that there is
no damage to the stoa sewer because he has realized 'whe~ he tilt and backed off
~ediately. If we ~d thru *,here is some damage, we 'a~t ex~ect it m be ~ed by you.
Catellu~:
t, ..,..,,., ,~,,,iu mac vz. ~.nd c, ut in thc first year so [:~,,, the M'..~Ln:er. ance
Bond is still in
La~:
! hav:~ talked to. Cop?e~ about the vpen cu'ts az Canon because k just wfl~ not bc
~o~.g m th~ c. ut~ un!il I h.~,.~ a cma craw ou~ he:e for the re~t of t::e
Coppe!l:
What we have dane in the pa~l i~ accepted the u~e of a ~ex base ~tead of the lime
stab~atien for s~ree, cu~ and repMr.
You're looking fox an ~.,'ceptable ;ctnp<,raD' patch.
Coppell:
The ncmai street repak ~ CcppeH has the pavement cut back 12' f~om zhe trench
~o provide a bench ~esdon of vk~ soft for the new slab on w~ch to rest. ?dthou~ we
be tie~g steel back into the e~fing pavemen% I am a little fearful of the floa~ on lhe new
flab ,~thout zhat bench to rest on. q~% m~y need to saw lhose open ctlts ¥.-~ :k i,r.u:her .'~
to prox4fie tha~ bench section.
The City Ordnance crmceming 3:;a:~s ~e~gnt f~ berg b~vesfiga~ed u~ ~e-
~t.,m zompiakut~ re~ive(.~ :h~ Ci~'. p-a,~-;~e has now mewed :..,(::'e side
Department
~ecause riley d~fl ~Nc a compiMm
~'~c Dc~ .... ,~ .... ~bc, m tb~ c]c~u-:'~ of Cc)t~on Road.
' ' "~ .,.t .... plan as an e~hibit.
b~t i iler, d tO aUach a bamca.~ ~d "-","-~
%e b.~eades on F~eepoa need zo be ch~cked and replaced as needed.
~ letter about closa~'e of Cotton Road was sent to SDH~, .~finyard'% and
us neeue~ ac~crfihlg disc~skms.
End of Summon'
if yot~ have arty ques.~o,.s, comment% additions, or deletians, please submit them to
Michael ~o~-,~,,- ,;, '~ ~'
........... w.,h ..Mbert H. Halff ~%odates at (~..4~ :39-0u94. If comments are
received by m, cn F~day, August 24, 1990 thc s~ma.O' will De considered approved
presented.
~e ~omxast t~',e began Friday, July 13, i990 ~d the ~or~ng day count t~ou~h
Au~st 16, ~ 990 is 25 days les~ 4 days ~ost to rain.
.~onstr~..~.,on ~im meeting is scheduled for Thursday, August 23, 1990
10:30 a.m.; at the intersection of Cotton Road and Freepo~ Pa~ay.
[ ~ S~cerely yours,
Michael P. John~on~ E.I.T.
Wayland ~wcadg/ll
B~ Jones
Bob Dygen
Larry Davis