Gateway BP(1.1)-CS 900724-,
ALBERT H. HALF}' ASSOCIATES, INC.
ENGINEERS · SCIENTISTS · SURVEYORS
DALLAS ' ARLINGTON · CHICAGO ' FORT WORTH
8616 NCR-HWEST PLAZA244.-739-0094DR"VE ,, DALLAS. -EXAS 75225
J /
July 24, 1990 ~// E
AVO 10564 ..
City of Coppell "
Department of Public Works
732 DeForest Road
...
Coppell, Texas 75019
Att: Ms. Shohre Danishmand, P.E. --
Acting City Engineer --'"
Re: ...Construetion/P~rmit Fee ."
...-- Gateway BusineSi 'Park - Phase I
~ar Shohre:
Please find enclosed the above referenced Construction Permit Fee in the amount
of $3,733.80 (Check No. 57668) as per the attached letter from Mr. John Karlsruher of Ginn,
Inc.
Yours very truly,
ALBERT H. HAI.FF ASSOCIATES, INC.
Patrick Lee Acker, P.E.
cc: Mr. Wayland Thread~ll, Catellus Development Corp.
'IAA%S:~OPTA- ON · .'.'-'-ER RESOLRCES · _AND %E'/ELDPM-_-I',I- · MU%.E =;._ · --'.'.' ~.O%MEH--'_ * S-F~.~T~A_
S.~'~'.'EY NS · -GL.DBA_ P.~SI- C%.NG SYS~EM .S p S .. · =EVO-E SEXS!%.~- .at..% '~¢~' =:::' big
LAix, D'SC ~' =E ARCHI-EC'.~F~E · P_AI'.NING
70-2382
Santa Fe Pacific Realty Corporation 7,9 o..oK,o.
201 MISSION STREET, THIRD FLOOR .5 7 0 0 8
SAN FRANCISCO, CALIFORNIA 94105
PAY THREE THOUSAND SEVEN HUNDRED THIRTY THREE DOLLARS & EIGHTY CENTS~*~ S 8
TOTHEORDEROF DATE CHECKAMOUNT
City of Coppell 7/18/90 $3,733.80#
Payable Through
Northern Trust Bank I Ou Page
""OS?g~"' t:O?&q~2~l: ~O~??O~""
GINN, INC. CONSULTING ENGINEERS
PLAT/PLAN REVIEW MEMORANDUM
Date: June 25, 1990
To: Steven G. Goram, Director
City of Coppell Public Works Department
C. Karlsruher, P.E. .././~'/~
From:
John
Re: Review Comments for the Final Plat and Engineering
Plans - Gateway Business Park Addition - 4th Review
PAVING PLANS:
No comments.
DRAINAGE PLANS:
1. Sheet SS-2 - The concrete saddle over the 60" RCP was
requested to help evenly support the proposed sanitary sewer
crossing of Line "A". Saddle must be revised as shown on
marked drawings.
2. Sheet DD-1 - Rock rip rap should be labeled to eliminate
uncertainty on the Contractor's part.
LANDSCAPE PLANS:
1. No revised plans received for review at this time.
The Engineer, by copy of this memorandum is directed to comply
with the review comments and resubmit his corrected plans with
the marked up plans representing the review comments contained
herein.
FEES DUE:
A. Water and Sewer Availability Fee @ $60/SF of Building Area
1/2 due prior to City Council consideration of each parcel.
$-0- due now.
B. Water Tap Fee @ $100/meter
Due prior to issuance of building permits
$-0- due now.
17103 Preston Road · Suite 100 · LB !!8 · Dallas, Texas 75248 · Phone 214/248-4900
C. Sewer Connection Fee @ $100/sewer connection
100% due prior to issuance of building permits
$-0- due now.
D.- Construction Permit Fee
First deposit @ $100 + $35/acre = $100 + $35 x 103.823 acres
= $3,733.80 due now.
Second deposit in an amount equal to 1.5% of the estimated
construction cost of the items proposed to be dedicated to
the City. This is due prior to issuance of a construction
permit.
E. Street Light Fee @ $292.60 per light for every 200 feet of
roadway. This fee is due prior to final acceptance of the
subdivision. Review with Coppell Public Works Street
Department.
F. Street Sign Fee as required by the Street Department. 'Due
prior to building permits being issued. Review with Coppell
Public Works Street Department.
TOTAL OF FEES DUE AT THIS TIME = $3,733.80.
For questions.regarding comments made by Public Works or
Engineering Department staff contact the following:
1. Water and Sewer - Water Superintendent, Mr. Howard Pafford,
at 214-462-8495.
2. Streets - Streets Superintendent, Mr. Per Birdsall, at 214-
462-8495.
3. Parks - Parks Superintendent at 214-462-8495.
4. Engineering - John C. Karlsruher, P.E., Ginn, Inc. Consulting
Engineers at 214-248-4900.
Should there be further questions on policy or disputes which may
need to be resolved, please contact Mr. Steve Goram, Director of
Public Works, at 214-462-8495.
cc: Gary Sieb
Pat Acker, Albert H. Halff & Assoc., Inc., w/marked plans