Loading...
Gateway BP(1.1)-CS 900724-, ALBERT H. HALF}' ASSOCIATES, INC. ENGINEERS · SCIENTISTS · SURVEYORS DALLAS ' ARLINGTON · CHICAGO ' FORT WORTH 8616 NCR-HWEST PLAZA244.-739-0094DR"VE ,, DALLAS. -EXAS 75225 J / July 24, 1990 ~// E AVO 10564 .. City of Coppell " Department of Public Works 732 DeForest Road ... Coppell, Texas 75019 Att: Ms. Shohre Danishmand, P.E. -- Acting City Engineer --'" Re: ...Construetion/P~rmit Fee ." ...-- Gateway BusineSi 'Park - Phase I ~ar Shohre: Please find enclosed the above referenced Construction Permit Fee in the amount of $3,733.80 (Check No. 57668) as per the attached letter from Mr. John Karlsruher of Ginn, Inc. Yours very truly, ALBERT H. HAI.FF ASSOCIATES, INC. Patrick Lee Acker, P.E. cc: Mr. Wayland Thread~ll, Catellus Development Corp. 'IAA%S:~OPTA- ON · .'.'-'-ER RESOLRCES · _AND %E'/ELDPM-_-I',I- · MU%.E =;._ · --'.'.' ~.O%MEH--'_ * S-F~.~T~A_ S.~'~'.'EY NS · -GL.DBA_ P.~SI- C%.NG SYS~EM .S p S .. · =EVO-E SEXS!%.~- .at..% '~¢~' =:::' big LAix, D'SC ~' =E ARCHI-EC'.~F~E · P_AI'.NING 70-2382 Santa Fe Pacific Realty Corporation 7,9 o..oK,o. 201 MISSION STREET, THIRD FLOOR .5 7 0 0 8 SAN FRANCISCO, CALIFORNIA 94105 PAY THREE THOUSAND SEVEN HUNDRED THIRTY THREE DOLLARS & EIGHTY CENTS~*~ S 8 TOTHEORDEROF DATE CHECKAMOUNT City of Coppell 7/18/90 $3,733.80# Payable Through Northern Trust Bank I Ou Page ""OS?g~"' t:O?&q~2~l: ~O~??O~"" GINN, INC. CONSULTING ENGINEERS PLAT/PLAN REVIEW MEMORANDUM Date: June 25, 1990 To: Steven G. Goram, Director City of Coppell Public Works Department C. Karlsruher, P.E. .././~'/~ From: John Re: Review Comments for the Final Plat and Engineering Plans - Gateway Business Park Addition - 4th Review PAVING PLANS: No comments. DRAINAGE PLANS: 1. Sheet SS-2 - The concrete saddle over the 60" RCP was requested to help evenly support the proposed sanitary sewer crossing of Line "A". Saddle must be revised as shown on marked drawings. 2. Sheet DD-1 - Rock rip rap should be labeled to eliminate uncertainty on the Contractor's part. LANDSCAPE PLANS: 1. No revised plans received for review at this time. The Engineer, by copy of this memorandum is directed to comply with the review comments and resubmit his corrected plans with the marked up plans representing the review comments contained herein. FEES DUE: A. Water and Sewer Availability Fee @ $60/SF of Building Area 1/2 due prior to City Council consideration of each parcel. $-0- due now. B. Water Tap Fee @ $100/meter Due prior to issuance of building permits $-0- due now. 17103 Preston Road · Suite 100 · LB !!8 · Dallas, Texas 75248 · Phone 214/248-4900 C. Sewer Connection Fee @ $100/sewer connection 100% due prior to issuance of building permits $-0- due now. D.- Construction Permit Fee First deposit @ $100 + $35/acre = $100 + $35 x 103.823 acres = $3,733.80 due now. Second deposit in an amount equal to 1.5% of the estimated construction cost of the items proposed to be dedicated to the City. This is due prior to issuance of a construction permit. E. Street Light Fee @ $292.60 per light for every 200 feet of roadway. This fee is due prior to final acceptance of the subdivision. Review with Coppell Public Works Street Department. F. Street Sign Fee as required by the Street Department. 'Due prior to building permits being issued. Review with Coppell Public Works Street Department. TOTAL OF FEES DUE AT THIS TIME = $3,733.80. For questions.regarding comments made by Public Works or Engineering Department staff contact the following: 1. Water and Sewer - Water Superintendent, Mr. Howard Pafford, at 214-462-8495. 2. Streets - Streets Superintendent, Mr. Per Birdsall, at 214- 462-8495. 3. Parks - Parks Superintendent at 214-462-8495. 4. Engineering - John C. Karlsruher, P.E., Ginn, Inc. Consulting Engineers at 214-248-4900. Should there be further questions on policy or disputes which may need to be resolved, please contact Mr. Steve Goram, Director of Public Works, at 214-462-8495. cc: Gary Sieb Pat Acker, Albert H. Halff & Assoc., Inc., w/marked plans