Loading...
Gateway BP(1.1)-CS 900625 GINN,INC. CONSULTING ENGINEERS PLAT/PLAN REVIEW MEMOP~%NDUM Date: June 25, 1990 ~-//~/~F--~~-~' To: Steven G. Goram, Director City of Coppell Public Works From: Re ~/~///--'~ ' - ineerln : Review Comment~ £v~ th~ F'~a~lat and Eng ' g Plans~teway Business P~rk A~dition - 4th Review PAVING PLANS: No comments. DRAINAGE PLANS: 1. Sheet SS-2 - The concrete saddle over the 60" RCP was requested to help evenly support the proposed sanitary sewer crossing of Line "A". Saddle must be revised as shown on marked drawings. 2. Sheet DD-1 - Rock rip rap should be labeled to eliminate uncertainty on the Contractor's part. LANDSCAPE PLANS: 1. No revised plans received for review at this time. The Engineer, by copy of this memorandum is directed to comply with the review comments and resubmit his corrected plans with the marked up plans representing the review comments contained herein. FEES DUE: A. Water and Sewer Availability Fee @ $60/SF of Building Area 1/2 due prior to city Council consideration of each parcel. $-0- due now. B. Water Tap Fee @ $100/meter Due prior to issuance of building permits $-0- due now. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 C. Sewer Connection Fee @ $100/sewer connection 100% due prior to issuance of building permits $-0- due now. D. Construction Permit Fee First deposit @ $100 + $35/acre = $100 + $35 x 103.823 acres = $3,733.80 due now. Second deposit in an amount equal to 1.5% of the estimated construction cost of the items proposed to be dedicated to the City. This is due prior to issuance of a construction permit. E. Street Light Fee @ $292.60 per light for every 200 feet of roadway. This fee is due prior to final acceptance of the subdivision. Review with Coppell Public Works Street Department. F. Street Sign Fee as required by the Street Department. Due prior to building permits being issued. Review with Coppell Public Works Street Department. TOTAL OF FEES DUE AT THIS TIME = $3,733.80. For questions regarding comments made by Public Works or Engineering Department staff contact the following: 1. Water and Sewer - Water Superintendent, Mr. Howard Pafford, at 214-462-8495. 2. Streets - Streets Superintendent, Mr. Per Birdsall, at 214- 462-8495. 3. Parks - Parks Superintendent at 214-462-8495. 4. Engineering_ - John C. Karlsruher, P.E., Ginn, Inc. Consulting Engineers at 214-248-4900. Should there be further questions on policy or disputes which may need to be resolved, please contact Mr. Steve Goram, Director of Public Works, at 214-462-8495. cc: Gary Sieb Pat Acker, Albert H. Halff & Assoc., Inc., w/marked plans