Loading...
Gateway BP(1.1)-CS 900615 GINN, INC. CONSULTING ENGINEERS June 15, 1990 /~ Mr. Steve Goram City of Coppell P.O. Box 478 / a' TX 750!~.._~ ....... -. teway~s~9~ ~ark Dear Mr. Goram: We have reviewed the plans and enclosed submittal to the State Department of Highways and Public Transportation. It is our recommendation that you forward the attached plans to the District 18 office of the SDHPT with the enclosed transmittal letter prepared by Albert H. Halff Associates, Inc. We have also reviewed the June 5, 1990 letter to you from Albert H. Halff Associates, Inc. regarding the installation of the double 60" RCP across Cotton Road. The issue of whether or not to require the installation of these pipes by dry bore depends on whether or not the road can be closed or partially closed during installation of the pipe. If it is feasible to close one or both lanes on Cotton Road then the less expensive open cut method can be considered. If it is not feasible to close all or part of Cotton Road then the pipes must be installed by some method which involves tunneling, boring, or boring and jacking. Dry boring is the only method currently approved in the City of Coppell for this kind of work. Please inform us of your preference in this matter and we will be happy to respond to Albert H. Halff Associates, Inc. Sincerely, John C. Karlsruher, P.E. Senior Engineer JCK/dsp enclosures cc: H. Wayne Ginn, P.E. File 90441 17103 Preston Road ® Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 ALBERT II. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS · SURVEYORS DALLAS · ARLINGTON · CHICAGO · FORT WORTH 8616 NORTHWEST PLAZA DRIVE · DALLAS. TEXAS 75225 2'~ 4.,739-0094 June 8, 1990 AVO 10564 City of Coppell 732 DeForest Road Coppell, Texas 75019 Attn: Mr. Steve Goram Director of Public Works Re: Gateway Business Park Phase I, SDHPT Approval of Gateway Boulevard and Cotton Road Intersection Dear Mr. Goram: '""' Please find enclosed 3 sets of construction drawings for SDHPT approval. Please submit two sets of the drawings to the SDHPT and retain one set for your files. The drawings have been revised as requested by Mr. John Blain in our meeting on Thursday. Also please find enclosed a sample letter of traxlsmittal to the SDHPT for your use. As we discussed on the phone today, this project does not deal with the Gateway Boulevard Royal Lane intersection and the previous city council approval for the Gateway Boulevard alignment and roadway width through this project is adequate for submittal to the DSHPT. Please notify me as soon as possible if this understanding is incorrect or if the City Submittal to the SDHPT will be delayed for any reason. The timely submittal and SDHPT approval of the Cotton Road intersection is critical in keeping this project on schedule. Please note that the address on the sample letter is the delivery address. If possible, I would request that the submittal be delivered to the SDHPT. We will be more than happy to provide the delivery service. TRANSPOR-AT'ON · WA-ER RESOURCES · LAND DEVELOPMENT ,, MUNICIPAL · ENV~RONME",TAL · STRL, CTuRAL SURVEYING · GLOBAL POSITIONING SYSTEM (G.P S ) · ~EMO~E SENSING AND MAPPING LANDSCAPE ARCHITECTURE * PLANNING ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISYS · SURVEYORS City of Coppell June 8, 1990 Page 2 Thank you for your time in this matter. If I can be of any assistance or if you need any additional information, please contact me. Very truly yours, AI.BERT H. HALFF ASSOCIATES, INC. Patrick Lee Acker, P.E. PLK/ael June 8, 1990 AVO 10564 DELIVERY ADDRESS State Department of Highways and Public Transportation Dallas District 18 9700 East R.L. Thornton Frwy. Dallas, Texas Attn: James Hnffman, P.E. District Engineer Re: Gateway Boulevard and Cotton Road, Intersection at IH635 Coppell, Texas Dear Mr. Huffman: Please find enclosed two sets of the above referenced design drawings for your review and approval. Halff Associates has made the revisions requested, in our meeting with Mr. John Blain and Mr. Leroy Wallen, on Thursday, June 7, 1990. The City of Coppell agrees with these plan changes and approves the paving relocation as shown on Sheets P-1 and P-4, dated February 1990, revised June 8, 1990. The City of Coppell will accept the maintenance of 4~ Cotton Road4nd Gateway Boulevard paving within the SDHPT right-of-way east of Station 10+71.02 as shown on Sheet P-1. The traffic control for this section of the project will consist of closing Cotton Road to through traffic from Freeport Parkway to Royal Lane during construction. Thank you for your time and consideration on this project. If you have any questions or require any further information please contact me. Very truly yours, CITY OF COPPEI.I. Steve Goram Director of Public Works PF/ael '" ~ ' 4.:z~.68 o.s ~l~r~ cc: Mr. Pat Acker vo 65~ ~' 5acCo r, o~- 51~ext: ?~+ os-o-,,. ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS · SURVEYORS DALLAS · ARLINGTON · CHICAGO · FORT WORTH 5.616 NC~--.A'EST =_.aZ.,Z'. DR '.-= · C.-,".L_.~'S -=-"z5 7522'5 21-' June 5, 1990 AVO 10564 City of Coppell 255 Parkway Coppell, Texas 75019 Attn: Mr. Steve Goram Director of Public Works Re: Gateway Business Park Final Construction Drawings Dear Steve: Please find enclosed '(2) sets of the above referenced construction drawings. Also please find attached the set of City review comments. All comments have been addressed. We have submitted one set of the drawings to Mr. John Karlsruher, with Ginn and Associates. The landscaping and irrigation plans are being submitted under a separate cover by the landscape architect for this project. Although we have revised the plans to indicate that water, sanitary sewer and storm sewer improvements crossing the existing streets are to be installed by dry bore we would ask that this be reconsidered, especially in the case of the double 60-inch RCP storm sewer crossing Cotton Road shown on sheet SS-2 Changing the installation from open cut methods to a dry bore will greatly increase its cost. -=ANSF-'Or~TAT ON · 'A'-"-E:R RESOurCeS' c,. . LAND CE .E_OPMENT SU~'.:.?,':NG · GLCBA. POS.-,CI',h%3 SYSTEM (G.? S '! · RE'dOT= 5E'.S-'.G AND !,'AF= ,%3 L~' ;.DSCAF-~ ~FC~!TE'.Z-URE ALBERT H. HALFF ASSOCIATES, INC. ENGINEERS · SCIENTISTS , SURVEYORS City of Coppell June 5, 1990 Page 2 Thank you for your time and consideration in this matter. Please notify me when the plans are approved so that we may proceed with the construction phase of this project as soon as possible. The final plat goes before the City Council for approval June 12, 1990. We will be receiving bids on this project this Friday, June 8, 1990. Yours very truly, ALBERT H. HALFF ASSOCIATES, INC. Patrick Lee Acker, P.E. PLA/ael cc: Mr. Wayland Threadgill Catellres Development Corporation Mr. John Karlsruher Ginn and Associates