Loading...
ST0001-CS010807 T H E C I T Y O F COPPELL A 8 - ~ August 7, 2001 Mr. David P. Stettner Manager of Technical Services Alpha Testing, Inc. 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 RE: Creekview Drive and Freeport Parkway Project ST 00-01 Construction Materials Testing Dear Mr. Stettner: The City of Coppell intends to construct the Creekview Drive and Freeport Parkway Project. The project consists of approximately 2800 linear feet of four-lane undivided roadway, the reconstruction of approximately 800 linear feet of an existing two-lane road to a four-lane divided roadway, drainage improvements, sidewalks, and 3600 linear feet of 8- to 12-inch water line. It is anticipated that construction will begin in October 2001. We are providing an estimate of the type and number of construction materials tests required for the Project based on the construction plans and the City's standards. Please submit a proposal for the construction materials testing. Your consideration of this matter is appreciated and should you have any questions or need any additional information, please contact me at 972-304-3679. Sincerely, Suzar(C~ Taylor C.I.P.'~6ordinator Attachments 255 PARKWAY ~ P.O BOX 478 ~ COPPELL TX 75019 1Ir TEL 972/462 0022 ~ FAX 972/304 3673 CREEKVIEW DRIVE & FREEPORT PARKWAY PROJECT (ST00-01) CONSTRUCTION MATERIALS TESTING ESTIMATE Site Preparation Approximately 3000 C.Y. of fill material will be placed in two locations (15-foot depth and 6-feet depth). (Assumed 1 FDT per 8" lift in each location) 1. Nuclear Density Test ..........: ........................... 31/each 2. Standard Proctor Test ....................................... 1/each 3. Atterberg-limit Test .......................................... 1/each Mechanical Lime Stabilization Approximately 19,000 S.Y. ( 3705 L.F.) of subgrade will be mechanically lime stabilized. (Assumed 1 FDT and Gradation for each 300 L.F.) 1. Nuclear Density Test ..................................... 12/each 2. Standard Proctor Test ...................................... 3/each 3. Atterberg-limit Test ......................................... 3/each 4. Gradation ..................................................... 12/each Concrete Testing A total of 20,200 C.Y. will be placed. (Assumed 1 set of 4 cylinders each 150 C.Y. plus another 25 9[ for hand-pours) 1. Concrete Compression Tests ....................... 670 cylinders Utilities Storm Sewer- (A total of 815 L.F. and assumed average depth of 5' and 1 FDT per each 8" lift.) Water Line - (A total of 2810 L.F. and assume an average depth of 3.5' and 1 FDT per each 8" lift.) (A total of 850 L.F. and assumed an average depth of 6' and 1 FDT per each 8" lift.) 1. Nuclear Density Test ..................................... 93/each 2. Standard Proctor Test ...................................... 5/each 3. Atterberg-limit Test ......................................... 5/each HMAC Approximately 1550 S.Y. of HMAC will be placed. 1. Asphalt Extraction Type "D" ........................... 1/each 2. Asphalt Extraction Type "B" . ........................... 1/each Sidewalks A total of 3530 L.F. of sidewalk will be constructed. (Assume 1 FDT for each 300 L.F.) 1. Nuclear Density Test .................................... 12/each