Coppell CC 1B1-CS010905 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin, Director of Engineer ing
Glenn Hollowell, Director of Public Works
/ Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
From: Larry Davis, Construction Inspector67~//~
Date: September 5, 2001
RE: WALK-THRU for Coppeil Commerce Center (Koll Center)
A final walk-thru for paving and utilities on the referenced project has been scheduled for
Wednesday, September 12, 2001 at 8:30 a .m.
If I can be of further assistance please let me know.
cc: 1//Lee Stone, Commercial Inspector
~/Roland Asebedo, Asst. Fire Marshal
Bryan Daigle, Hill & Wilkinson 214-299-4444
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"