Gateway BP(1.4)-CS 960229DEVELOPMENT REVIEW COMMITTEE
ENGINEE NG COMMENTS
ITEM: C_~__..~ Bu._'_e~_ ess Park. lte_~at of ~k 2 (H~em's~. ~ ~ ~
1~ 2R ~ 3 ~ ~ ~w ~ ~e~~ of a 220,~75 ~
f~ ~~ ~~ f~ ~ a ~0,~ ~ f~ o~
ce~er, ~ ~ ~e ~e~ co~r of ~ BM., ~
~e~n ~., ~ ~e ~ea of H~ ~~s, I~.
DRC DA~: Feb~ 29, 1~ ~ M~k 7, 1~
CO.ACT: Ken ~, P.E., ~~ ~ M~er/~ En~eer
Replat Comments
1. Provide water, sanitary sewer and drainage plans.
2. Show sight-visibility triangles at all ingress/egress points.
3. Gateway Circle should be offset from the proposed driveway to the south by 125' or
lined up.
4. Water, wastewater and roadway impact fees are required.