Loading...
Gateway BP(1.4)-CS 960229DEVELOPMENT REVIEW COMMITTEE ENGINEE NG COMMENTS ITEM: C_~__..~ Bu._'_e~_ ess Park. lte_~at of ~k 2 (H~em's~. ~ ~ ~ 1~ 2R ~ 3 ~ ~ ~w ~ ~e~~ of a 220,~75 ~ f~ ~~ ~~ f~ ~ a ~0,~ ~ f~ o~ ce~er, ~ ~ ~e ~e~ co~r of ~ BM., ~ ~e~n ~., ~ ~e ~ea of H~ ~~s, I~. DRC DA~: Feb~ 29, 1~ ~ M~k 7, 1~ CO.ACT: Ken ~, P.E., ~~ ~ M~er/~ En~eer Replat Comments 1. Provide water, sanitary sewer and drainage plans. 2. Show sight-visibility triangles at all ingress/egress points. 3. Gateway Circle should be offset from the proposed driveway to the south by 125' or lined up. 4. Water, wastewater and roadway impact fees are required.