Loading...
Gateway BP(1.4)-CS 930915To: From: RE: Date: bIElVIORANDUIVI Taryon Bowman, Planning and Zoning Coordinator Kenneth M. Griffin, P.E. , City Engineer FINAL Engineering Comments for DRC 8/26/93 & 9/2/93 September 15, 1993 Replat of Gateway Business Park Lot I and 2, Block 2 - located at the northwest corner of Freeport Parkway and Gateway Blvd. The current plat filed for record for Gateway Business Park shows a street running east to west through Block 2. This street is important in the fact that it was located generally in the area where the drainage would be conveyed. There was a proposed drainage system in the street. By eliminating the street, you are also eliminating the area to provide a drainage system. It is my understanding that there is a facility to be constructed on Lot 1 that has a building approximately 1000 feet long that would stretch from north to south on the lot and in essence block any opportunity to convey drainage through this site. A revised drainage plan should be submitted for this site to insure that adequate provisions are being provided for the conveyance of drainage through the site. 3. The Master Plan shows that a 16" water line should be installed along Freeport Parkway.