Loading...
Gateway BP(1.5)-LR000606 GEOTECHNICAL AND ENVIP. ON I'fl ENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Advance Business Center Southeast Corner of Exhange and Gateway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Ddve, Suite 105 Irving, Texas 75038 A'I-I'N: Ms. KathyTreat CONTRACTOR: Pacific Builders REPORT NO. 50 REPORT DATE: 06-06-00 REG PROJECT NO. 6309 DATE OBSERVED: 05-26-00 TECHNICIAN: H. Johnson PAGE: 1 of 1 J Items Observed: Paving: 0-71'N, and 0-275'E of the N.W. building corner. Grade Beam: line A-A. 19 between 1 and 1.19. Reference Plans or Notes Used: I Sheets DC-1 and S3.1 X IThere were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents, Distribution: (1) Catellus Development Corporation/ Ms. Kathy Treat (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Tri-Tex Construction/Mr. Mitch Owen (1) Pacific Builders/Mr. Brad Jameson (1) Halff Associates/Mr. Derek Downs Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. KA/je 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019