Loading...
Gateway BP(1.5)-LR000523 (2) GEOTECHNICAL AND J [~J F=JJ r-i i I j=~ EN¥1RONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Advance Business Center Southeast Corner of Exhange and Gateway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 105 Irving, Texas 75038 A'I'TN: Ms. Kathy Treat REPORT NO, 51 REG PROJECT NO. 6309 SAMPLE DATE: 05-23-00 TECHNICIAN: E. Rico CONTRACTOR: Pacific Builders Location of Sample Set Number I Location I Quantity Represented 1 Paving: 20'N, 150'E of the NW corner of Bldg. 20/400 2 Paving: 25'N, 60'E of the NW corner of Bldg. 110/400 3 Paving: 90'N of the NW corner of Bldg. 210/400 4 Paving: 40'S, 30'W of the NW corner of Bldg. 310/400 Design Information J Source of Concrete J Mix Identification TXI 8273 Specified Strength p.s.i. 4000 Test Results Set CylinderI No. ID Date Tested 1 6049 05-30-00 6049 06-20-00 6049 06-20-00 6049 Hold Age~ Total Load I CompressiveI Average Test lbs. Strength p.s.i. Strength p.s.i. 7 96820 28 28 H 2 6050 05-30-00 7 6050 06-20-00 28 6050 06-20-00 28 6050 Hold H 3 6051 05-30-00 7 6051 06-20-00 28 6051 06-20-00 28 6051 Hold H 3420 97420 3450 4 6052 05-30-00 7 6052 06-20-00 28 6052 06-20-00 28 6052 Hold H 10272O 3630 96750 3420 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data Set Cylinder NO. 1 I Timeof I I Concrete I Air Ticket ID Slump Sample Air Temp. Temp. Entrainment Number 6049 5.00 6:10AM 76 83 6050 5.25 7:28AM 74 85 6051 4.75 8:50AM 84 85 6052 3.75 10:46AM 86 92 4.4 1582814 3.5 1582924 3.4 1583O73 3.2 1583218 Distribution: (1) Catellus Development Corporation/ Ms. Kathy Treat (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Tri-Tex Construction/Mr. Mitch Owen (1) Pacific Builders/Mr. Brad Jameson (1) Halff Associates/mr. Derek Downs Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith Atkins KEA/rt