Gateway BP(1.5)-LR000221OEOTECHNICAL AND ~ ~ r-i U ~
ENVIRONPIENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Advance Business Center
Southeast Comer of Exhange and Gateway
Coppell, Texas
REPORTED TO:
Catellus Development Corporation
4545 Fuller Drive, Suite 105
Irving, Texas 75038
A'I'TN: Ms. Kathy Treat
REPORT NO. 11
REPORT DATE: 02-21-00
REG PROJECT NO. 6309
TECHNICIAN: P. Olegario
PAGE: 1 of 1
On these dates a representative of Reed Engineering Group, Inc. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth I Injection Intervals
I Injection Spacing
I Injection Pressure
I
(psi) (in)
I
10 5 100-200 12-18
Equipment
Number of Rigs I Number of Probes I Length of Probes Probe Spacing
I
(ea) I (it) (It)
2 4 11.5 5
Daf_e I Area Injected (sq It) I Average Pressure (psi) I Pass No.
02-09-00 20,000 115 2
02-10-00 20,000 115 2
02-11-00 24,000 115 3
02-12-00 8,000 115 3
Surfactant added at regular intervals: Yes
Note: Only one rig used on February 12, 2000.
Distribution:
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Tri-Tex Construction/Mr. Mitch Owen
(1) Pacific Builders/Mr. Brad Jameson
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
KEA/mm
2424 STUTZ DR. · SUITE 400 · DALLAS. TX 7523.5 · TEL [214] 350 5&00 ,,, FAX [214] 350 001~)