Gateway BP(1.5)-LR000221 (2)GEOTECHNICAL AND ~ F~ ~ U I=~
ENVIRONMENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Advance Business Center
Southeast Corner of Exhange and Gateway
Coppell, Texas
REPORTED TO:
Catellus Development Corporation
4545 Fuller Drive, Suite 105
Irving, Texas 75038
ATTN: Ms. Kathy Treat
REPORT NO. 13
REPORT DATE: 02-21-00
REG PROJECT NO. 6309
TECHNICIAN: P. Olegario
PAGE: 1 of 1
On these dates a representative of Reed Engineering Group, Inc. observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted.
Specification
Injection Depth I Injection Spacing I Injection Pressure Injection Intervals
(ft) , (ft) , (psi) (in)
10 5 100-200 12-18
Equipment
2 4 11.5 5
Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No.
02-16-00 28,000 115 4
02-17-00 24,000 115 4
Surfactant added at regular intervals: Yes
Distribution:
(1) Catellus Development Corporation/
Ms. Kathy Treat
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Tri-Tex Construction/Mr. Mitch Owen
(1) Pacific Builders/Mr. Brad Jameson
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
KA/je
24.24 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 3S0 5600 · FAX [214] 350 0019