Loading...
Gateway BP(1.5)-LR000221 (2)GEOTECHNICAL AND ~ F~ ~ U I=~ ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Advance Business Center Southeast Corner of Exhange and Gateway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 105 Irving, Texas 75038 ATTN: Ms. Kathy Treat REPORT NO. 13 REPORT DATE: 02-21-00 REG PROJECT NO. 6309 TECHNICIAN: P. Olegario PAGE: 1 of 1 On these dates a representative of Reed Engineering Group, Inc. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth I Injection Spacing I Injection Pressure Injection Intervals (ft) , (ft) , (psi) (in) 10 5 100-200 12-18 Equipment 2 4 11.5 5 Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No. 02-16-00 28,000 115 4 02-17-00 24,000 115 4 Surfactant added at regular intervals: Yes Distribution: (1) Catellus Development Corporation/ Ms. Kathy Treat (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Tri-Tex Construction/Mr. Mitch Owen (1) Pacific Builders/Mr. Brad Jameson Submitted by: REED ENGINEERING GROUP, INC. Original Signed By James F. Phipps, P.E. KA/je 24.24 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 · TEL [214] 3S0 5600 · FAX [214] 350 0019