Loading...
ST9802-CS 990408 ':". ~PR-08-99 THU 09:22 ~M REBC""' INC FP, X NO. 972"48234 P. 01/02 :.:,.~- REBCON, INC. 1868 W. NORTH'WEST ttW'Y DALLAS, TEXA~j 75Z7-0 FAX (972)4,44-8234 PHiONE (972)444-8230 FAX COVER SHEET DATE: 4/8/99 TO: Ken Griffin FROM: Robert Bibby N'UMBER OF PAGES(INCLUDING TI-ilS COVER SHEET): P,/,_F,3,SE.RESPON'D ~ ALL PAGES ARE NOT R_ECEFVF, D. ,~ ~0RIGINAL TO FOLLOW VIA MAiL //fNO ORIGINAL TO FOLLOW :.- fiPR-08-99 THU 09:22 fi~ REBCON, INC Fg N0, 9724448234 P, 02/02 EBCON,, c. April 8, 1999 Mr. Pat Acker Halff Associates 8616 Northwest Plaza Drive Dallas, Texas 75225 Re: Dividend Drive ) Coppell, Texas Dear Mr. Acker: I have reviewed the plans and specifications for the referenced project as well as visiting the project site, and I have the following questions: 1. Does the adjacent property owner want the excess excavation from this project? 2. Proposal Item IV-3 describes concrete curb an.d gutter. Should this item be curb only? 3. Proposal Item IV-2 describes base including lime. How many pounds per square yard of lime ate required? 4. Sheet RD-1 shows the installation of Type 111 Barricades. How are these paid for?. 5. Sheet RD- l, note 8 and sheet RD-2, note 10 say to install swiping and buttons per the City ordinance. What striping and buttons ate required, and how will they be paid for?. 6. Sheet RD-2 shows the reloeation of the existing light pole. What is the new location of the light pole?. :' Who will pay for the relocation? 7. There are existing concrete payera in the median ofFreport Parkway which will have to be removed. ~: . How will this be paid for? ~Y ·' ' 8, Sheet RD-2, note 2 says to modify 'the existing irrigation System i,n the median. Who will perform this '. work, and how will it be paid for? What is the extent of the work required to modi~ the system?. 9. Sheet RD-2, note 3 says to relocate trees in the median. Who will perform this work, and how will it be paid for? How many trees will have to be relocated, and what will be their new location'? I0. Sheet RD-2, note 4 says to match the existing thickness of pavement in Freeport Parkway? What is the existing pavement thickness in Freeport Parkway? 11. Sheet RD-3 shows the proposed concrete base for the future brick pavers. Is the concrete base in the street paid for as Type D, 3000 PSI Reinforced Concrete Pavement? How is the 13" thick concrete base in the median paid for? Why is it 13" thick? Thank you for your tlm6 and help in answering these questions. Sincerely, REBCON, INC. cc: Mr. Ken Griffin, City of Coppetl 181~8 W. NORTHWEST HWY. DALLAS. TEXAS 75220 972/444-8230