EBCON,, c.
April 8, 1999
Mr. Pat Acker
Halff Associates
8616 Northwest Plaza Drive
Dallas, Texas 75225
Re: Dividend Drive )
Coppell, Texas
Dear Mr. Acker:
I have reviewed the plans and specifications for the referenced project as well as visiting the project site,
and I have the following questions:
1. Does the adjacent property owner want the excess excavation from this project?
2. Proposal Item IV-3 describes concrete curb an.d gutter. Should this item be curb only?
3. Proposal Item IV-2 describes base including lime. How many pounds per square yard of lime ate
required?
4. Sheet RD-1 shows the installation of Type 111 Barricades. How are these paid for?.
5. Sheet RD- l, note 8 and sheet RD-2, note 10 say to install swiping and buttons per the City ordinance.
What striping and buttons ate required, and how will they be paid for?.
6. Sheet RD-2 shows the reloeation of the existing light pole. What is the new location of the light pole?.
:' Who will pay for the relocation?
7. There are existing concrete payera in the median ofFreport Parkway which will have to be removed.
~: . How will this be paid for?
~Y ·' ' 8, Sheet RD-2, note 2 says to modify 'the existing irrigation System i,n the median. Who will perform this
'. work, and how will it be paid for? What is the extent of the work required to modi~ the system?.
9. Sheet RD-2, note 3 says to relocate trees in the median. Who will perform this work, and how will it be
paid for? How many trees will have to be relocated, and what will be their new location'?
I0. Sheet RD-2, note 4 says to match the existing thickness of pavement in Freeport Parkway? What is the
existing pavement thickness in Freeport Parkway?
11. Sheet RD-3 shows the proposed concrete base for the future brick pavers. Is the concrete base in the
street paid for as Type D, 3000 PSI Reinforced Concrete Pavement? How is the 13" thick concrete
base in the median paid for? Why is it 13" thick?
Thank you for your tlm6 and help in answering these questions.
Sincerely,
REBCON, INC.
cc: Mr. Ken Griffin, City of Coppetl