Loading...
Freeport NIP(7.6)-CS000727 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Duke-gFeeks Realt~ Corporation, Final Plat, to allow the construction of Freeport Parkway and the development of office/warehouse facilities on approximately 142 acres of property along the north side of I~. Bethel Road, south of Ruby Road, and west of Coppell Road, at the request of Pacheco Koch Consulting Engineers. DRC D,'I TE: July 27, 2000 and,4ugust 3, 2000 CONT~I CT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT STATUS: Pp~L r~..~'!Zn. !.a~v.Y ,,"FINAL P~F,-WdSF~ 1. Need to plat all utilities associated with the construction of Freeport Parkway (i.e. drainage easement which will run west to east through property). 2. Need to show existing right-of-way of Bethel Road. Right-of-way dedication will be needed to accomplish the 90' right-of-way needed for Bethel Road. 3. Need to show the existing right-of-way for Ruby Road. Right-of-way dedication may be needed to achieve the 60' right-of-way requirement.