ST9802-CS 990303 Coppell, Texas 75019
972-462-0022
Robert McCann March 3, 1999
Catells Developmentt Company
4~4~ ~u!ler Dri~e~ Suite ~00
I~g, TX 75038
L~dscap~g P.I.D. Projec~~
Development Fee Assessment
Dear Mr. McCann:
Enclosed is a copy of ~e Ci~ of Coppell Development Fee Assess:n~t table, along with
a copy of ~e Development Fee calculations for the referenced development.
Ple~e m~e pa~ent to ~e Ci~ of Coppell ~ ~e ~o~t of $2~695,60 ~d fo~d to
the F~ce Dep~ent along wi~ a copy of ~e Fee Assessment table. ~s ~o~t is a
potion of ~e ~sessed fees ~at need to be p~d p~or to Co~cil approval. Ple~e refer to
the a~ched ~ble for additional fee~. ~so provide a copy of ~e Eng~e~'s estate or'
contact to o~ office so ~e cons~c~on ~ection fee c~ be verified.
Prodding a copy of yo~ paid r~eipt to ~e En~neefing Depament will help us to
ved~ ~e pa~ent of required fees ~d ~s~e a success~l begimg of ~s project. We
look fo~d to worlg with you on t~s project. If you have ~y questions, piece
contact me.
S~cerely,
Michael A. M~, P.E. '
Assist~t Ci~ En~neer
cc: Je~f~ ~s~ng, Fin~ce Dkector
Doug Stevens, Enginecrag Tectci~
Gle~ Hollowell, Assist~t Director of Public Works
Greg Jones, C~efBuild~g Official
G~ S~s, D~ector of Leis~e Seaices
DEVELOPMENT FEE TABLE
Project: Landscaping P. L D. Project
Date: 3/3/99
TOTAL
FEES DUE
Water Impact Fec $2,250.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $285.60
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00
(100 % due prior to Council Approval)
Roadway Impact Fee $0.00
(100% due prior to Council Approval)
Street Light Fee $0.00
(100% due prior to Acceptance of Project
Street Sign Fee $0.00
(100% due prior to Acceptance of Project
Construction Inspection Fee $0.00
TOTAL $2,695.60
DEVELOPMENT FEE WORKSHEET
PROJECT: Landscaping P. LD. Project
DATE: 3/3/99
Water Impact Fee:
Domestic Meter(s): 0 = 0 ESU's
Irrigation Meter(s): 2 - 11/2 inch = 5 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 5 ESU's @ $450.00 ea. $2,250.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea. $100.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00 $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 2 Irrigation Meter(s) @ $142.80 $285.60
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea. $0.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea. $60.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $450.00 ea. $0.00
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Page 1