Freeport NIP(7.6)-CS000727 (2) DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Duke-Weeks RealtF Corporation, Final Plat, to allow the construction of
Freeport Parkway and the development of office/warehouse facilities on
approximately 142 acres of property along the north side of gE. Bethel Road,
south of Ruby Road, and west of Coppell Road, at the request of Pacheco Koch
Consulting Engineers.
DRC DATE: Jury 27, 2000 andAugust 3, 2000
CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENT STATUS: ,/PRELIMINARY gtNAg
1. Need to plat all utilities associated with the construction of Freeport Parkway (i.e. drainage
easement which will nm west to east through property).
2. Need to show existing right-of-way of Bethel Road. Right-of-way dedication will be
needed to accomplish the 90' right-of-way needed for Bethel Road.
3. Need to show the existing right-of-way for Ruby Road. Right-of-way dedication may be
needed to achieve the 50' right-of-way requirement.