Freeport NIP(7.6)-CS000817 CITY OF COPPELL
PLANNING DEPARTMENT
STAFF REPORT
CASE: DUKE-FREEPORT ADDITION~
LOT 1 OF BLOCK A~ LOT 2 OF BLOCK B AND LOT 3
OF BLOCK C
PRELIMINARY PLAT
P & Z HEARING DATE: August 17, 2000
C.C. HEARING DATE: September 12, 2000
LOCATION: Along the north side of W. Bethel Road, south of Ruby Road and
west of Coppell Road.
SIZE OF AREA: Approximately 144 acres of property (of which 10.083 acres is to
be platted as Freeport Parkway r.o.w.)
CURRENT ZONING: LI (Light Industrial)
REQUEST: Preliminary Plat approval.
APPLICANT: Duke-Weeks Realty Pacheco-Koeh Engineers
5495 Beltline Road 9401 LBJ Freeway
Suite 360 Suite 300
Dallas, Texas 75240 Dallas, Texas 75243
(972) 361-6700 (972) 235-3031
Fax: (972) 361-6800 Fax: (972) 235-9544
HISTORY: There has been no recent development history on this 140 acre plus
parcel although a zoning case to rezone to PD was approved by the
Planning Commission on April 20, 2000. That recommendation was
not forwarded to City Council at the request of the applicant.
Item # 11
TRANSPORTATION: Freeport Parkway is shown as a C4D/6 four lane divided
thoroughfare, to be contained within a 110 foot right of way. It
currently does not extend through this property, hence the reason for
the plat.
SURROUNDING LAND USE & ZONING:
North- vacant and developing duplexes; LI and 2F9
South - warehousing; LI
East - residences and commercial; SF-12, PD SF-7, HO-C
West - vacant; LI
COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for
light industrial uses.
DISCUSSION: This proposal is primarily for the dedication of fight-of-way for the extension
of Freeport Parkway through the Duke-Weeks property. In toto,
approximately 10 acres of land are shown to be dedicated for this roadway.
With a r.o.w, width of 110 feet there will be ample room for utilities,
pavement, etc. required by ordinance.
A secondary comment relates to the ultimate development of this land once
the street has been platted..Plarm/ng Commission approved rezoning this
parcel fi.om LI to PD in April. Subsequent to that action, the applicant
requested a delay in forwardihig the PD recommendation to Council.
Provided the applicant understands that a final plat for any building site can
not be processed until permanent zomg has been established, staff can
support this submittal.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
As outlined above, provided the applicant is platting this property for the
purpose of dedicating the right-of-way for the extension and construction of
Freeport Parkway, staff can support the request. However, if the purpose of
the plat is to establish building sites for construction, there are a number of
additional processes the applicant must go through before the plat is ready for
approval. For example, the property has been approved for PD zoning by the
Planning Commission. Before any development could occur on site, the PD
would have to be considered by City Council. Assuming rezoning is
eventually approved, then minimum setbacks, fire lanes, landscape
requirements, site plan approval would all have to be considered before any
developmem could occur.
Item# 11
ALTERNATIVES:
1) Recommend approval of the request
2) Recommend disapproval of the request
ATTACHMENTS:
1) Departmental comments (Engineering)
2) Departmental comments (TXU)
3) Conditions for approval of the PD
4) Preliminary Plat Document
Item # 11
DEVELOPMENT REVIEW C OMMITFEE
ENGINEERING COMMENTS
ITEM: Duke-FVeeks Realt~ Corporation, Prelimina~ Plat, to allow the construction of
Freeport Parkway and the development of office/warehouse facilities on
approximately 142 acres of property along the north side of W. Bethel Road,
south of Ruby Road, and west of Coppell Road, at the request of Pacheco Koch
Consulting Engineers.
DRC DATE: July 27, 2000 and August 3, 2000
CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENT STATUS: parT.,. ,.,..,,.-,.,.,,.,.,.,r~'~r~ra,., .,.,.,.,.z:'v ,"'FINAL IvuV~Z/-$-E-~
1. Need to plat all utilities associated with the construction of Freeport Parkway (i.e. drainage
easement which will mn west to east through pr6'perty).
2. Need to show existing right-of-way of Bethel Road. Right-of-way dedication will be
needed to accomplish the 90' right-of-way needed for Bethel Road.
3. Need to show the existing right-of-way for Ruby Road. Right-of-way dedication may be
needed to achieve the 60' right-of-way requirement.
' ~ ? 0 TXU
TXU Electric & Gas
4200 North Belt Line
Irvin~ TX 75038
Comments for City of Coppell d U L 2 7 2
Development Review Committee .
July 26, 2000
Duke-Weeks Realty Corporation, Final Plat Easements needed. Contact Rick Fielding at 972-
888-1344.
Bobby Oney
AGENDA REQUEST FORM
The City W#h A Betutiful Furze
CITY COUNCIL MEETING: May 9, 2000 ITEM $$
ITEM CAPTION:
PUBLIC HEARING: Consider approval of Case No. PD-186. Duke-Weeks Realty_ Corporation. zoning
change request from LI (Light Industrial) to PD-LI (Planned Development, Light Industrial), to allow the
development of 7 office/warehouse facilities on approximately 142 acres of property along the north side of
W. Bethel Road, south of Ruby Road, and east of Coppell Road.
SUBMITTED BY: Gary L. Sieb
TITLE: Director of Planning and Community Services
STAFF COMMENTS:
Date of P&Z Meeting: April 20, 2000
Decision of P&Z Commission: Approved (6-0) with Commissioners Nesbit, McGahey, Kittrell, Clark,
Halsey and Stewart voting in favor. None opposed.
Approval recommended, subject to the following conditions:
1) Show brick paver bands at Freeport/Bethel Road:
2) Required landscape setbacks on west property line are 10 feet, not 5 feet.
3) Justify interior landscape calculations for buildings 5/6.
4) Consider retention vs. detention ponds.
5) Verify permanent landscaping requirement (shown on one plan as 1,120,129 square feet).
6) Insure Landscape Tabulations and Sheet A. 1 calculations track with one another (no building #1
data on Sheet A. 1, for example).
7) No building permit or Certificate of Occupancy shall be issued for any portion of the property until
a Detail Site Plan is approved alter a Public Hearing by the Planning Commission and City
Council.
8) Among other requirements, a color board will be required before a Detail PD will be reviewed.
9) A tree survey and tree preservation reparation will be required before development is allowed to
occur on the property.
10) Fire Department regulations will be addressed during plan review process.
11) Address Departmental comments.
Staff recommends approval.