Loading...
Gateway BP(2.1)-CS001122PROFESSIONAL INLINE SERVICES, INC, P.O. Box I 18095 · Carroilton, TX 75011-8095 RECEIVING Office 972-492-6988 FORM ~r- DATI/ / / PURCHASE ORDER NO. OR RETURNED OOODS"~ ~JX ........................... JF~EI~HT ~I[L NO. ' ' ........................... ~ ....... ~~.., 8 I0 . .ACKAO~SI WEIGHT EE ' ~ CHECKED BY DELIVERED BY SURE TO [ ~ ~KE THIS RECORD v ACCURATE AND COMPLETE Professional lnline Services, Inc. P.O.Box 118095 Carrollton, TX 75011 CONTRACTORS NAME:~I~ i ~""~ ~. ~--T (~ PROJECT: ~,~ktADf~ ~~[ ~%~ Q~ (~ ~- i' ~ INSPECTION FIRM: Professional Inline Sen'ices Inc. PROFESSIONAL INLINE SERVICES, INC: '~ Office 972-492-6988 P.O. Box 118095 Mobile 214-534-9942 Carrollton, TX 75011-8095 Beeper 214-249-2309 LOW PRESSURE AIR TEST FOR GRAVITY SANITARY SEWER ~est Procedure Eac.~ '"", of se~.,v.,'l sewer shall be tested between sucessive manholes. A~r shah be m-',roduced into the pipeline until 4.0 psi gauge pressure has been reached. A:. mat ~me me flow of air shall be reduced and the internal air pressure shall be maintained c. er..veer: 3 5 and 4.5 psi gauge for at least two(2) minutes to allow the air temperature to come .~ ~.4.~,,u.,~m with t,~e temperature of the pipe walls. Pressure in the pipe shall be constan!ly mon;~,3reg Dy a gauge and hose arrangement separate from the hose used to introduce mr ;".e ,ne 2ressdre m the p:pe Shall nOt be allowed to exceed 5 psi. '-.O,e~ the tempera(ute has stabilized and no air leaks at the plugs have been found, the air pressure s,qa~! be used to determine the time lapse required for the air pressure to drop to 2.5 psi gauge I! the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown ~r..e to~lo.c,.:nq fable, i:r~e p~pe shall be presumed to be within acceptable limits for ieakage if i.:he hme !apsed is less man that shown in the table, the contractor shall make corrections to reou-.:e t..",e :ea~age to acceptable limits. Line Information ] I [Test Results lair Test [Mandrel Line Stauon [o Static2 Pipe Size L.F.Tested Time Passed? Passed? Owner I'"'"'~'~ ~O,~, Date ProjectC~l~,:~'-;t O(((c.~_ Q.e,",~e~r ]N~.~,~. ~ Job# Tested B'/ inspectors Full Name ~PROFESSIONAL INLINE SERVICES, INC. P.O. BOX 118095 CARROLLTON, TX 75011 (972)939-2600 LOG REPORT 11-17-2000 CONTRACTOR:TRI-DAL INSPECTOR :LA_N-NY ALLISON OPERATOR :RUBEN.R CONT1LACT #:NONE TAPE # :1 PAGE # :1 PIPE INFORMATION MH STATION # :5+00 MH STATION # :5+56 PIPE TYPE :PVC PIPE SIZE :8" DIRECTION :UP GRADE :0.40% LINE # :A-STUBOUT JOB NAME :GATEWAY BUSINESS PARK NO.II LOCATION :COPPELL,TX CONDITION :NEW FOOTAGE: TIME OF DAY: FAULT OR COMMENTS: 0.0 Ft 3:12pm LINE A M.H STA.5+00 TO STUB-OUT 52.3 Ft 3:15pm STOPPED AT END OF STUB-OUT AT STA.5+56 ~PROFESSIONAL ~LINE SERVICES, INC. P.O. BOX 11~095 CARROLLTON, TX 75011 (972)939-2600 LOG REPORT 11-17-2000 CONTRACTOR:TRI-DAL INSPECTOR :LANNY ALLISON OPERATOR :RUBEN.R CONTRACT #:NONE TAPE # :1 PAGE # :2 PIPE INFORMATION MH STATION # :5+00 MH STATION # :0+00 PIPE TYPE :PVC PIPE SIZE :8" DIRECTION :DS GRADE :0.40% LINE # :A JOB NAME :GATEWAY BUSINESS PARK NO.II LOCATION :COPPELL,TX CONDITION :NEW FOOTAGE: TIME OF DAY: FAULT OR COMMENTS: 0.0 Ft 5:01pm LINE A M.H STA. 5+00 485.8 Ft 5:20pm STOPPED AT M.H STA.0+00 END OF LINE A END OF SURVEY