Loading...
Gateway BP(2.1)-CS001016October 16, 2000 Scott Langham TriDal Ltd. 540 Commerce Southlake, TX 76092 RE: Gateway Business Park, Lot 2, Block A (off Dividend Dr.) Dear Mr. Langham: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, October 14, 2000. The overtime rate including salary and benefits is $30.00 per hour. The minimum four hours were charged to your company on that date. Please send a copy of this letter along with your check for $120.00, payable to the City' of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (972) 304-3679. Sincerely, Construction Inspector cc: Finance Department Debi Ingram, Engineering Secretary 255 PARK-,N-~Y ~- 13 O BOX 478 1Ir COPPELL TX 75019 l&' TEL 972Y462 0022 ir FAX 972;304 3673 540 Commerce LTD. l, tetro (817) 481-2886 Southlake, TX 76092 Fax (817) 481-8195 Lanny Allison ConstructJon Inspector City of Coppeli Fax: 9 72- 30'1- 3570 Reference: Saturday Work Subject: Gateway Business Park TD # 00101 Fir. Allison, Please accept this letter as notification that TH Dal L~. would like to work this Saturday, the 14th of October, 2000, on the above mentioned project- Please call me if you have any questions or concerns. Respectfully,