Gateway BP(2.1)-CS 981202 General Contractors
C A D E N C E
Design/Build
Conso-uction
McS H A N E
Construaion
3lanagement
CORPORATION
December 2, 1998
Mr. Garreth D. Campbell, Sr.
Construction Inspector
City of Coppell Via Fax & Mail: (972) 304-3570
P.O. Box 478 w/original in mail
Coppell, Texas 75019
RE: Lucent Technologies
111 ! Freeport Pkv~T.
Coppell, Texas 75019
Cadence McShane Project No. 5027
Dear Garreth:
Enclosed are my calculations for the paving in the R.O.W. and erosion control. With your approval
of the values I will provide the required maintenance bonds. The utility.' work will be handled
separately by our subcontractor, Fire Line Services. Please let me know if the values are correctly
calculated.
VeD- truly yours,
DENCE McSHANE CORPORATION'
'~raig A. Morris
Vice President
CAM:kw
Encl.
cc: Phil Bailey
14860 Montfort Dr., Suite 270 Dallas, TX 75240 (972) 239-2336 fax (972) 239-1214
LUCENT TECHNOLOGIES
1111 FREEPORT PKWY
PERMANENT EROSION CONTROLS
Flume Rip-Rap 175 cy ,.~ $45.00/cy $7,875.00
Embankment Seeding & Maintenance 27,000 sf,.~ $0.05/sf $1.350.00
Total $9,225.00
LUCENT TECHNOLOGIES
1111 FREEPORT PKWY
R.O.W. IMPROVEMENTS (CONCRETE)
Drive Approach 800 sf ~ $4.00!sf $3.200.00
Sidewalk 1550 sf ,~ $2.00/sf $3.100.00
Total $6,300.00