Loading...
Gateway BP(2.1)-CS 981029 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Gateway Business Park. Lot 1 & 2. Block A and Lot 1. Block B. Preliminar~ Plat and Site Plan Review for Lot 2. Block A. to allow the creation of 3 new lots and the development of a 2-story 103,611 square foot office building on Lot 2, located along the north side of LH. 635, and east of Freeport Parkway, at the request of Halff Associates, Ina DRC DA TE: October 29, 1998 and November 5, 1998 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT,..,eTA TUS: PRELIMINARY FINAL ,'"REVISED AFTER P&Z 1) A left turn lane will need to be constructed on Freeport Parkway to the proposed street. 2) Work done in the state right-of-way must be approved by the Texas Department Transportation (TxDOT). 3) Any paving treatment (e.g. brick pavers) in the city right-of-way not required by ordinanc~ will be maintained by the property owners association.