Gateway BP(2.1)-CS 980227 Coppell, Texas 75019
972-462-0022
Beautiful
Future
~.~// //_~.~ P O. BOX 478
February 27, 1998
Steve Bryan
Catellus Development Corporation ~. :~ ' -~/
4545 Fuller Dr., Suite 100
Irving, TX 75038
RE: Gateway Business Park # 2, Phase 1 (Lucent Technologies)
Development Fee Assessment
Dear Mr Bryan:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of -$44,894.94- and forward.to tl~e~ -
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
S~f~elY' ~' .
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public Works
Greg/ones, Chief Building Official
Gary Sims, Dh'. Leisure Services
DEVELOPMENT FEE TABLE
Project: Gateway Business Park # 2, Phase 1 (Lucent Technologies)
Date: 2/27/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $8,325.00 $8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $195.98
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $2,655.08
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Irrigation/Fire) $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $29,773.88 $29,773.88
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $44,894.94
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $41,698.88
DEVELOPMENT FEE WORKSHEEI'
PROJECT: Gateway Business Park # 2, Phase 1 (Lucent Technologies)
DATE: 2/27/98
Water Impact Fee:
Domestic Meter(s): 1 - 2 inch = 8 ESU's
Irrigation Meter(s): I - 2 inch = 8 ESU's
= ESU's
Fireline Meter(s): 1 - 8 inch -- 2.5 ESU's
Total #: 18.5 ESU's @ $450.00 ea. 88,325.00
(100% due pridr to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ 850.00 ea. 8150.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: I Domestic Meter(s) @ $195.98 $195.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: I Irrigation Meter(s) @ 8195.98 8195.98
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: I Fireline Meter(s) @ 82,459.10 82,459.10
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: I Meter(s) @ 835.00 ea. $35.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ 830.00 ea. $60.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 8 @ $450.00 ea. $3,600.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. 850.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 3
D.-¢ELOPMENT FEE WORKSHEI .
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ 9150.00 / Lot N/A
N/A Multi-family @ 975.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 2;3, 1992:
N/A Single-family @ 9350.00 / Lot N/A
N/A Multi-family @ 9350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
N/A Single-family @ 91285.00 / Lot N/A
N/A Multi-family @ 91285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) 929,773.88
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at d~is time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, 9292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development conuacts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 4
ROAL ,CAY IMPACT FEE CALCULA. iONS
PROJECT: Gateway Business Park # 2, Phase 1 (Lucent Technology)
DATE: 2/27/98
ROADWAY IMPACT FEE:
Service Area * 10
Category ** Office
Land Use ** General Office Building
Building Size (Sq. Ft.) 99,495
Development Units ** 99.495
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x [
(Vehicle Miles per Development Uni0 x (Fee per Vehicle Mile) = $119,095.52
I
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
75 % Credit as per Resolution # 022498.1 = $89,321.64