Gateway BP(1.3)-LR 991220GEOTECHNICAL AND ~ ~ I"-I U ~
ENVIRONMENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO:
Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT NO. 74
REPORT DATE: 12-20-99
REG PROJECT NO. 5167
DATE OBSERVED: 12-02-99
TECHNiClA'R'~. E. Rico
PAGE: 1 of 1
CONTRACTOR: Pacific Builders, Inc.
- ~ - _~_ - .. Paving: 0-40'S and 30-50'E of N.E. building corner.
30-310'S and 50-100'E of N.E. building corner.
_ . Sheets: A101 and C103
Missing chairs.
The noted deviations were reported to: Superintendent
X The noted deviations were corrected.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Distribution:
(1) Catellus Development
Corporation/Mr. Robert McCann
(1) Pacific Builders, Inc./
Mr. Jim Kinder
(1) Potters Concrete/
Mr. Daniel Lewis
(1) AECC, Inc./Mr. Matt Rader
(1) Gromatzky Dupree & Associates/
Mr. Scott McCrary
(1) Brockette*Davis*Drake/
Mr. Allen Lowes
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
James F. Phipps, P.E.
BW/je
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 * FAX [214] 350 0019