Gateway BP(1.3)-LR 991207 GEOTECHNICAL AND
ENVIRONPIENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO:
Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT NO. 60
REG PROJECT NO. 5167
SAMPLE DATE: 12-07-99
TECHNICIAN: P. Houston
CONTRACTOR: Pacific Builders, Inc.
Location of Sample
3 Paving: 75'N, 80 E of SE Bldg. Corner 250/250
Test Results
1 808 12-14-99 7 127450 4510
808 01-04-00 28 163180 5770
808 01-04-00 28 157670 5580 5680
808 Hold
809 12-14-99 7 104130 3680
809 01-04-00 28 133670 4730
809 01-04-00 28 139000 4920
809 Hold
4830
3
810 12-14-99 7 130210 4610
810 01-04-00 28 165750 5860
810 01-04-00 28 162810 5760
810 Hold
5810
2424 STUTZ DR. · SUITE 400 o DALLAS, TX 75235 * TEL [214] 350 5600 · FAX [214] 350 0019
Cylinder Data
1 808 5.75 6:30 AM 45 66 5.0 6724
2 809 7.00 8:00 AM 57 69 5.5 6733
3 810 6.25 11:45 AM 60 68 5.0 6744
Distribution:
(1) Catellus Development Corporation/
Mr. Robert McCann
(1) Pacific Builders, Inc./Mr. Jim Kinder
(1) Potters Concrete/Mr. Daniel Lewis
(1) AECC, Inc./Mr. Matt Rader
(1) Gromatzky Dupree & Associates/
Mr. Scott McCrary
(1) Brockette*Davis*Drake/
Mr. Allen Lowes
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KENcdl/rt