Loading...
Gateway BP(1.3)-LR 990428REPORTED TO: CONTRACTOR: R EE: EE~ ~' ENVIRONMI REPORT OF LABORATORY COMPACTION TE,~ Gateway Business Center Freeport Parkway Coppell, Texas Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 A'I'TN: Mr. Robert McCann Pacific Builders, Inc. ~EOTECHNICAL AND iNTAL CONSULTANTS REPORT NO. 1.5 REPORT DAT [: 04-28-99 PROJECT NO. 5167 REG SAMPLE DATE:' 04-22-99 Distribution: 116.0 115.0 114.0 113.0 112.0 111.0 110.0 109.0 108.0 10.0 12.0 14.0 16.0 Moisture Content (%) (1) Catellus Development Corp/ Mr. Robert McCann (1) Pacific Builders, Inc./ Mr. Jim Kinder (1) Potters Concrete/ Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEE Original Signed Ronald F. Reed, RFPJcdl RING GROUP, INC. By P.E. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 T · TEL [214] 350 5600 · FAX [2141350 0019