Gateway BP(1.3)-LR 990423 GE
ENVIRONMEN'I
CONCRETE CYLINDER TEST REPORT
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO: Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT
REG PR(:
SAMPLE
TECHNIC
::)TECHNICAL AND ~ F~ r'-I U F=~
AL CONSULTANTS
NO. 51
IJECT NO. 5167
DATE: 04-23-99
lAN: G. Green
CONTRACTOR: Pacific Builders, Inc.
Location of Sample . I .........
I 1 Paving: 120'N of SE Bldg. Corner 7(~/120 I
Design Information
[ Pioneer 9351 4000
Test Results
1 2793 04-30-99 7 105250 3720
2793 05-21-99 28 129460 4580
2793 05-21-99 28 126220 4470 ~ 4530
2793 Hold i
Cylinder Data
1 2793 5.00 7:55 AM 78 83 4 3 255767
Distribution:
(1) Catellus Development Corporation/
Mr. Robert McCann
(1) Pacific Builders, Inc./Mr. Jim Kinder
(1) Potters Concrete/Mr. Daniel Lewis
(1) AECC, Inc./Mr. Matt Rader
(1) Gromatzky Dupree & Associates/
Mr. Scott McCrary
(1) Brockette*Davis*Drake/
Mr. Allen Lowes
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEEI
Original Signed
Keith E. Atkins
KEA/sa/rt
;UNG GROUP, INC.
3y
2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [21411 350 0019