Loading...
Gateway BP(1.3)-LR 990423 GE ENVIRONMEN'I CONCRETE CYLINDER TEST REPORT Gateway Business Center Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann REPORT REG PR(: SAMPLE TECHNIC ::)TECHNICAL AND ~ F~ r'-I U F=~ AL CONSULTANTS NO. 51 IJECT NO. 5167 DATE: 04-23-99 lAN: G. Green CONTRACTOR: Pacific Builders, Inc. Location of Sample . I ......... I 1 Paving: 120'N of SE Bldg. Corner 7(~/120 I Design Information [ Pioneer 9351 4000 Test Results 1 2793 04-30-99 7 105250 3720 2793 05-21-99 28 129460 4580 2793 05-21-99 28 126220 4470 ~ 4530 2793 Hold i Cylinder Data 1 2793 5.00 7:55 AM 78 83 4 3 255767 Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) Pacific Builders, Inc./Mr. Jim Kinder (1) Potters Concrete/Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEEI Original Signed Keith E. Atkins KEA/sa/rt ;UNG GROUP, INC. 3y 2424 STUTZ DR. * SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [21411 350 0019