Loading...
Gateway BP(1.3)-LR 990421 (2)REPORTED TO: GE~ ENVIRONMENT CONCRETE CYLINDER TEST REPORT Gateway Business Center Freeport Parkway Coppell, Texas Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann )TECHNICAL AND G F==I I-'1 ~L CONSULTANTS REPORT NO. 46 REG PROJECT NO. 5167 SAMPLE DATE: 04-21-99 TECHNII~IAN: H. Johnson CONTRACTOR: Pacific Builders, Inc. Location 01' ~ample 1 Paving: 20'N, 65'E of NE Bldg. Corner 1C/380 2 Paving: 90'S, 40'E of NE Bldg. Corner 12D/380 3 Paving: 125'S & 80'E of the NE Corner of Bldg. 22 0/380 4 Paving: 225'S, 60'E of NE Bldg. Corner 31,0/380 I Design Information I Pioneer 9351 ~ 4000 Test Results 1 2667 04-28-99 7 101420 3590 2667 05-19-99 28 125120 4430 ' 2667 05-19-99 28 125820 4450 4440 2667 Hold 2 2668 04-28-99 7 92350 3270 2668 05-19-99 28 129390 4580 2668 05-19-99 28 126860 4490 ' 4540 2668 Hold 3 2669 04-28-99 7 104840 3710 2669 05-19-99 28 125240 4430 2669 05-19-99 28 121870 4310 ' 4370 2669 Hold 4 2670 04-28-99 7 103210 3650 2670 05-19-99 28 121250 4290 2670 05-19-99 28 125490 4440 4370 2670 Hold 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · 'rEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data 1 2667 4.50 4:15 AM 62 65 4. 3 254441 2 2668 5.00 5:15 AM 63 65 5. ~) 254450 3 2669 5.50 6:35 AM 61 68 4. 3 254460 4 2670 5.50 8:00 AM 63 70 5.~) 254469 Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) Pacific Builders, Inc./Mr. Jim Kinder (1) Potters Concrete/Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEEF:ING GROUP, INC. Original Signed I~y Keith E. Atkins KEAsa/rt