Gateway BP(1.3)-LR 990517CONTRA CT INSPECTION SER VICE, Inc.
4305 Glenwood Ct. Granbury, TX 76049 (817) 2468096 FAX (817) 246-5889
REPORT OF
STRUCTURAL STEEL INSPECTION
Project:
Client:
Gateway 2
Coppell, TX
Reed Engineering
2424 Stutz, Suite 400
Dallas, TX 75235
Report No:. 13394-9
Attention: Keith Atkins
Date of Service: 5-17-99
Page 1 of 1
Drawings utilized:
REPORT OF INSPECTION
Structural
Locations/item inspected:
Reinspection roof level framing
Discrepancies/comments:
Between column lines A to G / 9 to 17:
1 .) Perimeter bent plate support angle for metal decking, eighteen (18) locations repaired along
west elevation. Welds now determined to be compliant.
*2.) Installation of metal decking between lines E to G / 7.5 to 14 not completed at this time.
*Discrepancies
Randy Walcker CWI//97121591
Technician
~ntract Inspection Service
This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client