Loading...
Gateway BP(2.1)-LR 981209 Engineering Co. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 145 Job No.: 1598-0007 Date Cast 12/09/98 Project Lucent Technologies - Phase I Specifica~on: 4500 psi ~ 28 days Location: Pavement approach - Entrance from Freeport Pkwy., Quantity Represented:. 10/70/120 cu. yds. 15' West; 5' North of curb. Contractor. Sampled By. W. Kirby Reported To: Catetlus - Robert McCann By Order Of: (6 x 12 Inch) Nominal Cylinde;' Size: Area-28.27 SQ. IN. Laboratory Number: '8710 Field Number. LI120901 LI120902 LI120903 LI120904 Test Date: 1 2/16/98 12/16/98 01/06/99 01/06/99 Maximum Load, LBS: 114690 120940 144050 149190 Age When Tested, Days: 7 7 28 28 Compressive Strength, PSI: 4060 4280 5090 5280 Average Strength, PSI: 4170 5190 Type Break: Conical (U.N.O.) Remarks: "* Method of Curing: Field 2 Days, Laboratory From 12/11 Transported By: W. Kirby Temperature: Ambient 40 °F Mix 59 °F Air Content 4.6 % Slump 5.0 Inches Time of Sample: 10:00 (AM)/PM Pick-Up Charge: Yes X No Source of Concrete: Redi-Mix Mix Code: 960 Ticket No.: 16228 Fine Aggregate: Unit Weight PCF Coarse Aggregate: Water. Yield CFICY Cement: Fly Ash: Admixture(s): Distribution: Cadence McShane GDA - Scott McCreary Haynes Whaley - Mark Thompson City of Coppell - Garreth Campbell Sign~d(~~ ,~.4~ ~ ~) ~-~.. t/~ 19~ Page I of 1 Teat Melftod~: ASTM C 31. C 39. C 143, C 173, C 192. C 231 and C I064