Loading...
Gateway BP(1.3)-LR 990513CONTRA CT INSPE CTION SER VICE, Inc. 4305 Glenwood Ct. Granbury, TX 76049 (817) 246-8096 FAX (817) 246-5889 REPORT OF STRUCTURAL STEEL INSPECTION Project: Client: Gateway 2 Coppell, TX Reed Engineering 2424 Stutz, Suite 400 Dallas, TX 75235 Report No:. 13357-9 Attention: Keith Atkins Date of Service: 5-13-99 Page 1 of 1 Drawings utilized: REPORT OF INSPECTION Structural Locations/item inspected: Roof level framing between line A to G and 9 to 17 Discrepancies/comments: * 1.) Column anchor bolts, all locations were determined to be compliant with the exception at line E - 14, no flat washers under nuts. *2.) Joist seat tilt wall lugs determined to be compliant with the exception of two (2) locations adjacent C - 17. 3.) Joist and joist girder seat welds determined to be compliant. *4.) Joist bridging not complete at side walls. 5.) Joist girder double angle installation over columns determined to be compliant. *Discrepancies Randy Walcker CWI #97121591 Technician This report is for the exclusive use of our client and shall not be modified or reproduced without written approval from said client