Loading...
Gateway BP(1.3)-LR 990417 (3)REPORTED TO: GE~ ENVIRONMENT CONCRETE CYLINDER TEST REPORT Gateway Business center Freeport Parkway Coppell, Texas Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann CONTRACTOR: Pacific Builders, Inc. REPORT REG PR(: SAMPLE TECHNIC Location of Sample )TECHNICAL AND ~L CONSULTANTS ¢O. 53 tJECT NO. 5167 DATE: 04-17-99 lAN: D. Hammett /10 J Design Information 3000 J Test Results 1 2525 04-3 - 2525 04-30-99 7 62570 2210 I 2240 2525 05-21-99 28 2525 05-21-99 28 Cylinder Data J 1 2525 5.00 1:00 PM Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) Pacific Builders, Inc./Mr. Jim Kinder (1) Potters Concrete/Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEE Original Signed Keith E. Atkins KENsa/rt fA 254239 J ~ING GROUP, INC. By 2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214 350 0019