Gateway BP(1.3)-LR 990504 (2) GEOTECHNICAL AND J ~ J~J I"-I U F~
ENVIP, ONHENTAL CONSULTANTS
REPORT OF FIELD DENSITY TESTS
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO:
Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT NO. 44
REPORT DATE: 05-04-99
REG PROJECT NO. 5167
TECHNICIAN: M. Schneider
PAGE: 1 of 1
CONTRACTOR: Pacific Builders, Inc.
1 D-698 Brown sandy clay (cement-treated) 36.5 79.5
2 D-698 Dark gray clay 27.0 91.5
3 D-698 Reddish brown clayey sand "select" fill 13.5 107.5
144 04-20-99 Paving: 15'S, 40'E(1)
145 Paving: 150'S, 30'E(1)
146 Paving: 290'S, 40'E(1)
147 Paving: 450'S, 40'E(1)
0.0 90.3 30.2 2 98.7
0.0 88.4 31.5 2 96.6
0.0 87.3 32.1 2 95.4
0.0 90.9 27.7 2 99.3
Comments: Where tested, materials were in compliance with project specifications.
Footnote: (1) Measurements referenced from N.E. building corner.
Distribution:
(1) Catellus Development Corporation/
Mr. Robert McCann
(1) Pacific Builders, Inc./Mr. Jim Kinder
(1) Potters Concrete/Mr. Daniel Lewis
(1) AECC, Inc./Mr. Matt Rader
(1) Gromatzky Dupree & Associates/
Mr. Scott McCrary
(1) Brockette*Davis*Drake/
Mr. Allen Lowes
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
BW/je
2424 STUTZ DR. · SUITE 400 * DALLAS, TX 75235 * TEL [214] 350 5600 · FAX [214] 350 0019