Loading...
Gateway BP(2.1)-LR 981205 Engineering Co. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 Mr. Robert McCann Project No.: 1598-0007 Catellus Development Corp. Project: Lucent Technologies I 4545 Fuller Dr., Suite 100 Location: Driveway Approach Subgrade Irving, Texas 75038 Report No.: 142/8703 RESULTS OF FIELD DENSITY TESTS TEST DATE RETEST TEST LOCATION LIFT/ PROCTOR FIELD FIELD PERCENT NO. OF DEPTH TEST DENSITY MOISTURE OF TEST NO. PCF 0,% SPECIFIED *'D~tBER COMPACTION 127 12/05/98 125 5' South; 30' West of North East Comer Final 7 98.4 30.7 88.0* 128 12/05/98 126 55' South; 30' West of Approach Final 7 97.7 31.1 87.5* TESTS PERFORMED BY: L. Savage TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 2937 REMARKS: *hadicates the moisture and/or density does not meet the required specifications. SPECIFICATIONS: 95% compaction PROCTOR NO. : /t7-117.5 pcf~ 14.1% moisture DISTRIBUTION: Cadence McShane GDA, Scott McCreary Ha)ales Wlmley- Mark Thompson City of Coppell - GaITeth Campbell PAGE 1 OF 1