Loading...
Gateway BP(2.1)-LR 981118 [ngineering Co. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 123 Job No.: 1598-0007 Date Cast: 11/18/98 Project: Lucent Technologies - Phase I Specification: 3500 psi @ 28 days Location: Flume - North side of Building; 35' West from Quantity Represented: ~O/2.0/40 cu. yds. North East corner of Building Contractor: Sampled By: U. Boone Reported To: Catellus - Robert McCann By Order Of: (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Laboratory Number: 8529 Field Number: L1111801 LIl11802 LIl11803 LIl111804 Test Date: 11/25/98 11/25/98 12/16/98 12/16/98 Maximum Load, LBS: 103100 102180 135940 132570 Age When Tested, Days: 7 7 28 28 Compressive Strength, PSh 3650 3620 4810 4690 Average Strength, PSI: 3640 4750 Type Break: Conical (U.N.O.) Remarks: Method of Curing: Field 1 Days, Laboratory From 11/19 Transported By: M. Boone Temperature: Ambient 72 °F Mix 84 °F Air Content 5.0 % Slump 2.5 Inches Time of Sample: 11:00 (AM)/PM Pick-Up Charge: Yes X No Source of Concrete: Redi-Mix MixCode: 908 Ticket No.: 15286 Fine Aggregate: Unit Weight PCF Coarse Aggregate: Water: Yield CF/CY Cement: Fly Ash: Admixture(s): Distribution: Cadence McShane GDA - Scott McCreary Haynes Whaley - Mark Thompson City of Coppell - Garreth Campbell Signed~"~(:~)' ~ ~ Page 1 of 1 Test Methods: ASTM C 31, C 39. C 143. C 173, C 192, C 231 and C 1064