Gateway BP(1.3)-LR 990428 (3) GEOTECHNICAL AND I r=~ R r"l L_I I;~
ENVIRONHENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO:
Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
REPORT NO. 54
PEG PROJECT NO. 5167
SAMPLE DATE: 04-28-99
TECHNICIAN: G. Ortiz
CONTRACTOR: Pacific Builders, Inc.
Location of Sam le
I 1 SW Approach: 35'S, 50~/V of SW Bldg. Comer 20/60 I
Pioneer 9351 4000
Test Results
I 2954 05-05-99 7 97480 3450
2954 05-26-99 28
2954 05-26-99 28
2954 Hold
2954 S.50 1:05 PM 88 86 4.2 256164
Distribution:
(1) Catellus Development Corporation/
Mr. Robert McCann
(1) Pacific Builders, Inc./Mr. Jim Kinder
(1) Potters Concrete/Mr. Daniel Lewis
(1) AECC, Inc./Mr. Matt Rader
(1) Gromatzky Dupree & Associates/
Mr. Scoff McCrary
(1) Brockette*Davis*Drake/
Mr. Allen Lowes
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Keith E. Atkins
KEA/sa
2424 STUTZ DR. · SUITE 400 · DALLAS. TX 75235 · TEL [2141 350 5600 · FAX [2141 350 0019