Gateway BP(2.1)-LR 981202 EnginBering Co.
9200 King Arthur Drive
Dallas, Texas 75247-3610
Phone 214/631-4372 Fax 214/831-4380
Mr. Robert McCann Project No.: 1598-0007
Catellus Development Corp. Project: Lucent Technologies I_~.
4545 Fuller Dr., Suite 100 Location: Flex Base for Pavingd~Enttance
Irving, Texas 75038 Report No.: 141/8676
RESULTS OF FIELD DENSITY TESTS
TEST DATE RETEST TEST LOCATION LIFT/ PROCTOR FIELD FIELD PERCENT
NO. OF DEPTH TEST DENSITY MOISTURE OF
TEST NO. PCF % SPECIFIED
.~mE~ co.~mACnO~
125 12/02/98 10' South; 10' West of NE Comer of Entrance 56 Final 7 108.5 9.3 92.3*
126 12/02/98 65' South; 10' West of NE Comer of Entrance 56 Final 7 106.6 10.4 90.7*
TESTS PERFORMED BY: R. Mannette TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 2937
REMARKS: *Indicates the moisture and/or density does not meet the required specifications.
SPECIIrlCATIONS: 95% compaction
PROCTOR NO.: #7- 117.5 pcf~ 14.1% tnoisture
DISTRIBUTION: Cadence McShane
GDA, Scott McCreary
HaD~es Whaley - Mark Thompson
City of Coppell - Garreth Campbell
PAGE 1 OF I