Loading...
Gateway BP(1.3)-LR 990412GEOTECHNICAL AND J~ F=J r'"l U I=3 ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Gateway Business Center Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann REPORT NO. 41 REG PROJECT NO. 5167 SAMPLE DATE: 04-12-99 TECHNICIAN: H. Johnson CONTRACTOR: Pacific Builders, Inc. Location of Sample 1 Panel ~3 10/300 2 Panel #32 110/300 3 Panel # SP6 and SP5 220/300 Design Information Pioneer 9337 3000 Test Results 1 2233 04-15-99 3 71830 2540 2233 04-16-99 4 75930 2690 2233 04-19-99 7 87700 3100 2233 05-10-99 28 112200 3970 2233 05-10-99 28 120800 4280 2233 Hold 4130 2234 04-15-99 3 65210 2310 2234 04-16-99 4 74220 2630 2234 04-19-99 7 92460 3270 2234 05-10-99 28 111410 3940 2234 05-10-99 28 111010 3930 2234 Hold 3940 2235 04-15-99 3 62900 2230 2235 04-16-99 4 67400 2380 2235 04-19-99 7 86460 3060 2235 05-10-99 28 112290 3970 2235 05-10-99 28 116780 4130 2235 Hold 4O5O 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data ........ i ............... ~ ..... 5.00 4:25 AM 61 68 N/A 171362 2 2234 5.00 5:30 AM 67 67 N/A 171370 3 2235 5.50 7:25 AM 67 68 N/A 171384 Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) Pacific Builders, Inc./Mr. ,Jim Kinder (1) Potters Concrete/Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KEA/sa/rt GEOTECHNICAL AND ~ I==J I'--1 ENVIRONI"IENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Gateway Business Center Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 A'I'TN: Mr. Robert McCann REPORT NO. 4O REG PROJECT NO. 5167 SAMPLE DATE: 04-09-99 TECHNICIAN: H. Johnson CONTRACTOR: Pacific Builders, Inc. Location of Sample 1 Panel #3 30/400 2 Panel #8 120/400 3 Panel #19 220/400 4 Panel #27 320/400 Design Information I Pioneer 9337 3000 Test Results 1 2077 04-16-99 7 111630 3950 2077 05-07-99 28 142440 5040 2077 05-07-99 28 140960 4990 5020 2077 Hold 2 2078 04-16-99 7 96530 3400 2078 05-07-99 28 127000 4490 2078 05-07-99 28 127600 4510 2078 Hold 45OO 3 207~ 04-12-99 3 77080 2730 2079 04-16-99 7 91630 3240 2079 05-07-99 28 122410 4330 2079 05-07-99 28 112500 3980 2079 Hold 4160 4 2080 04-12-99 3 81830 2890 2080 04-16-99 7 91490 3240 2080 05-07-99 28 129880 4590 2080 05-07-99 28 123830 4380 2080 Hold 4490 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data 1 2077 4.50 3:20 AM 70 73 N/A 160711 2 2078 5.00 5:30 AM 72 72 N/A 160720 3 2079 5.00 7:45 AM 73 75 N/A 233205 4 2080 4.50 8:50 AM 75 81 N/A 160741 Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) Pacific Builders, Inc./Mr. Jim Kinder (1) Potters Concrete/Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KENsa/rt