Loading...
Gateway BP(2.1)-LR 981117 - -- -- Engineering Co. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 138 Job No.: 1598-0007 Date Cast: 11/17/98 Project: Lucent Technologies - Phase I Specification: 3000 psi (~} 28 days Location: Piers - W1,2,3 & E1,2,3 for Stairway Quantify Represented: 10/10/10 cu. yds. Contractor: Sampled By: L. Savage Reported To: Catellus - Robert McCann By Order Of: (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Laboratory Number: 8540 Field Number: LIl11701 LIl11702 LIl11703 LIl11704 Test Date: 11/24/98 12/15~98 12/15/98 HOLD Maximum Load, LBS: 97890 129480 130300 Age When Tested, Days: 7 28 28 HOLD Compressive Strength, PSi: 3460 4580 4610 Average Strength, PSh 4600 Type Break: Conical (U.N.O.) Remarks: Method of Curing: Field Days, Laboratory From Transported By: Temperature: Ambient 58 °F Mix 70 °F Air Content 2.1 % Slump 4.5 Inches Time of Sample: 1:30 AMI(PM) Pick-Up Charge: X Yes No Source of Concrete: Redi-Mix MixCode: 914 Ticket No.: 15238 Fine Aggregate: Unit Weight PCF Coarse Aggregate: Water: Yield CF/CY Cement: Fly Ash: Admixture(s): Distribution: Cadence McShane GDA - Scott McCreary Haynes Whaley - Mark Thompson ~,~ ~). ~ t ?../i~,/¢~' City of Coppell - Garreth Campbell Signed ~ Page. 1 of 1 Test Melhods: ASTM C 31, C 39. C 143, C 173, C 192, C 231 and C 1064