Loading...
Gateway BP(1.3)-LR 990409 GEOTECHNICAL AND G F::J I--I I I ~ ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT. Gateway Business Center Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann REPORT iNO. 40 REG pROJECT NO. 5167 SAMPLE iDATE: 04-09-99 TECHNICIAN: H. Johnson CONTRACTOR: Pacific Builders, Inc. Location of Sample ~anel #3 ......... 30[/400 2 Panel #8 120/400 220/400 I 3 Panel #19 ' I 4 Panel #27 320/400 Design Information 9337 3000 I P oneer Test Results 1 2077 04-16-99 7 111630 3950 2077 05-07-99 28 2077 05-07-99 28 2077 Hold 2 2078 04-16-99 7 96530 2078 05-07-99 28 2078 05-07-99 28 2078 Hold 34O0 3 2079 04-12-99 3 77080 2730 2079 04-16-99 7 91630 3240 2079 05-07-99 28 2079 05-07-99 28 2079 Hold 4 2080 04-12-99 3 81830 2890 2080 04-16-99 7 91490 3240 2080 05-07-99 28 2080 05-07-99 28 2080 Hold 2424 STUTZ DR. * SUITE 400 * DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data ........ i ~:~:~' ~.50 3:20 AM 70 73 N/A 160711 2 2078 5.00 5:30 AM 72 72 N/A 160720 3 2079 5.00 7:45 AM 73 75 N/A 233205 4 2080 4.50 8:50 AM 75 81 N/A 160741 Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) Pacific Builders, Inc./Mr. Jim Kinder (1) Potters Concrete/Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Dra ke/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KENsa/rt GEOTEC:HNICAL AND ~ F::;J r--I U F= ENVIRONHENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Gateway Business Center Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann REPORT NO. 40 REG PROJECT NO. 5167 SAMPLE DATE: 04-09-99 TECHNICIAN: H. Johnson CONTRACTOR: Pacific Builders, Inc. Location of Sample 1 Panel #3 30/400 2 Panel #8 120/400 3 Panel #19 220/400 4 Panel #27 320/400 Design Information J Pioneer 9337 3000 Test Results 1 2077 04-16-99 7 111630 3950 2077 05-07-99 28 2077 05-07-99 28 2077 Hold 2 2078 04-16-99 7 96530 3400 2078 05-07-99 28 2078 05-07-99 28 2078 Hold 3 2079 04-12-99 3 77080 2730 2079 04-16-99 7 91630 3240 2079 05-07-99 28 2079 05-07-99 28 2079 Hold 4 2080 04-12-99 3 81830 2890 2080 04-16-99 7 91490 3240 2080 05-07-99 28 2080 05-07-99 28 2080 Hold 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Cylinder Data 1 2077 4.50 3:20 AM 70 73 N/A 160711 2 2078 5.00 5:30 AM 72 72 N/A 160720 3 2079 5.00 7:45 AM 73 75 N/A 233205 4 2080 4.50 8:50 AM 75 81 N/A 160741 Distribution: (1) Catellus Development Corporation/ Mr. Robed McCann (1) Pacific Builders, Inc./Mr. Jim Kinder (1) Potters Concrete/Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Keith E. Atkins KENsa/rt