Loading...
Gateway BP(1.3)-LR 990407 (2)F~ E E 1--1 GE ENVIRONMENT CONCRETE CYLINDER TEST REPORT Gateway Business Center Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann CONTRACTOR: Pacific Builders, Inc. REPORT REG PR(; SAMPLE TECHNIC Location of Sample 1 Panel fl-,47 7(3 2 Panel #52 17 3 Panel #55 2~ 4 Panel #62 3~ 5 Panel #68 4~ 6 Panel #1 5~ Design Information I Pioneer 9337 Test Results 1 2025 04-14-99 7 92120 3260 2025 05-05-99 28 110050 3890 2025 05-05-99 28 111750 3950 2025 Hold 2 :)TECHNICAL AND ~ F:=J I'--1 I I p AL CONSULTANTS NO. 48 ~JECT NO. 5167 DATE: 04-07-99 lAN: K. Denbraven 3 /600 0/600 0/600 0/600 0/600 0/600 3000 J 4 2026 04-14-99 7 88700 3140 2026 05-05-99 28 107180 3790 2026 05-05-99 28 114390 4050 2026 Hold 2027 04-14-99 7 87100 3080 2027 05-05-99 28 113630 4020 2027 05-05-99 28 111750 3960 2027 Hold 2028 04-14-99 7 79530 2810 2028 05-05-99 28 104900 3710 2028 05-05-99 28 105150 3720 2028 Hold 3920 392O 399O 3720 2424 STUTZ DR. · SUITE 400 . DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Test Results 5 2029 04-14-99 7 86200 3050 2029 05-05-99 28 119230 4220 2029 05-05-99 28 110410 3910 4070 2029 Hold 6 2030 04-14-99 7 87980 3110 2030 05-05-99 28 113250 4010 2030 05-05-99 28 111080 3930 2030 Hold Cylinder Data 1 2025 4.75 4:45 AM 54 75 N. 2 2026 5.00 6:00 AM 56 72 N. 3 2027 5.00 7:00 AM 57 74 N. 4 2028 5.00 8:45 AM 68 74 N. 5 2029 5.00 10:00 AM 68 76 N. 6 2030 5.00 10:45 AM 70 75 N. Distribution: (1) Catellus Development Corporation/ Mr. Robert McCann (1) Pacific Builders, Inc./Mr. Jim Kinder (1) Potters Concrete/Mr. Daniel Lewis (1) AECC, Inc./Mr. Matt Rader (1) Gromatzky Dupree & Associates/ Mr. Scott McCrary (1) Brockette*Davis*Drake/ Mr. Allen Lowes (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEEI Original Signed Keith E. Atkins KEA/sa/rt 3970 UNG GROUP, INC. 3y 160503 'A 160520 'A 160528 'A 160544 'A 160556 'A 160566