Gateway BP(1.3)-LR 990407 (2)F~ E E 1--1
GE
ENVIRONMENT
CONCRETE CYLINDER TEST REPORT
Gateway Business Center
Freeport Parkway
Coppell, Texas
REPORTED TO: Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
CONTRACTOR: Pacific Builders, Inc.
REPORT
REG PR(;
SAMPLE
TECHNIC
Location of Sample
1 Panel fl-,47 7(3
2 Panel #52 17
3 Panel #55 2~
4 Panel #62 3~
5 Panel #68 4~
6 Panel #1 5~
Design Information
I Pioneer 9337
Test Results
1 2025 04-14-99 7 92120 3260
2025 05-05-99 28 110050 3890
2025 05-05-99 28 111750 3950
2025 Hold
2
:)TECHNICAL AND ~ F:=J I'--1 I I p
AL CONSULTANTS
NO. 48
~JECT NO. 5167
DATE: 04-07-99
lAN: K. Denbraven
3
/600
0/600
0/600
0/600
0/600
0/600
3000 J
4
2026 04-14-99 7 88700 3140
2026 05-05-99 28 107180 3790
2026 05-05-99 28 114390 4050
2026 Hold
2027 04-14-99 7 87100 3080
2027 05-05-99 28 113630 4020
2027 05-05-99 28 111750 3960
2027 Hold
2028 04-14-99 7 79530 2810
2028 05-05-99 28 104900 3710
2028 05-05-99 28 105150 3720
2028 Hold
3920
392O
399O
3720
2424 STUTZ DR. · SUITE 400 . DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019
Test Results
5 2029 04-14-99 7 86200 3050
2029 05-05-99 28 119230 4220
2029 05-05-99 28 110410 3910 4070
2029 Hold
6 2030 04-14-99 7 87980 3110
2030 05-05-99 28 113250 4010
2030 05-05-99 28 111080 3930
2030 Hold
Cylinder Data
1 2025 4.75 4:45 AM 54 75 N.
2 2026 5.00 6:00 AM 56 72 N.
3 2027 5.00 7:00 AM 57 74 N.
4 2028 5.00 8:45 AM 68 74 N.
5 2029 5.00 10:00 AM 68 76 N.
6 2030 5.00 10:45 AM 70 75 N.
Distribution:
(1) Catellus Development Corporation/
Mr. Robert McCann
(1) Pacific Builders, Inc./Mr. Jim Kinder
(1) Potters Concrete/Mr. Daniel Lewis
(1) AECC, Inc./Mr. Matt Rader
(1) Gromatzky Dupree & Associates/
Mr. Scott McCrary
(1) Brockette*Davis*Drake/
Mr. Allen Lowes
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEEI
Original Signed
Keith E. Atkins
KEA/sa/rt
3970
UNG GROUP, INC.
3y
160503
'A 160520
'A 160528
'A 160544
'A 160556
'A 160566