Loading...
Gateway BP(2.1)-LR 981109 (2) 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 131 JobNo.: 1598-0007 DateCast: 11/09/98 Project: Lucent Technologies - Phase I Specification:4000 psi (~ 28 days Location: Paving - 40' North; 140' East of North West Quantity Represented: 10/140/170 cu. yds. Corner of Bldg. Contractor: Sampled By:. S. Spinks Reported To: Catellus - Robert McCann By Order Of: ($ x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Laboratory Number: 8448 Field Number: LIl10901 LIl10902 LIl10903 LIl10904 Test Date: 11/12/98 Maximum Load, LBS: 106730 Age When Tested, Days: 7 28 28 Hold Compressive Strength, PSI: 3770 Average Strength, PSh Type Break: Conical (U.N.O.) Remarks: Method of Curing: Field 3 Days, Laboratory From 11/12 Transported By: M. Boone Temperature: Ambient 57 °F Mix 64 °F Air Content 4.6 % Slump 5.0 Inches Time of Sample: 7:30 (AM}IPM Pick-Up Charge: Yes X No Source of Concrete: Redi-Mix Mix Code: 915 Ticket No.: 14895 Fine Aggregate: Unit Weight PCF Coarse Aggregate: Water: Yield CF/CY Cement: Fly Ash: Admixture(s): Distribution: Cadence McShane GDA - Scott McCreary Haynes Whaley - Mark Thompson City of Coppell - Garreth Campbell Signed~'~ ~;~' Page 1 of 1 Test Melhods: ASTM C 31. C 39, C 143, C 173, C 192, C 231 and C 1064