Gateway BP(2.1)-LR 981015 Ir] illilBBerllg CO.
9200 King Arthur Drive
Dallas. Texas 75247-3610
Phone 214/631-4372 Fax 214/631-4380
Mr. Robert McCann Project No.: 1598-0007
Catellus Development Corp. Project: Lucent Technologies I
4545 Fuller Dr., Suite 100 Location: Parking Lot Area - Subgrade
Irving, Texas 75038 Report No.: 123/8163
RESULTS OF FIELD DENSITY TESTS
TEST DATE RE'rEST TEST LOCATION LIFT/ PROCTOR FrRT.r) F~.T i~ PERUEN'r
.x,'O. OF DEPTH TEST DENSITY MOISTURE OF
TEST NO. PCF % SPECIFIED
NUMBER COMPACTION
121 I0/15/98 50' W X 15' S of SW Comer of Bldg, Final 6 85.9 30.8 97.6
122 10115198 105' W X 15' S of SW Comer of Bldg. Final 6 84.6 32.1 96. I
123 10/15/98 115' W X 75' N of SW Comer of Bldg. Final 5 88.7 29.9 97.3
124 10/15/98 - 120' W X 5' S of NW Comer of Bldg. Final 5 89.0 29.3 97.7
125 10/15/98 - 40' W X 45' S of NW Comer of Bldg. Final 5 88.1 29.6 96.6
TESTS PERFORMED BY: R. Marmette TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 2937
SPECIFICATIONS: 95% compaction @ optimum to +2% moisture.
PROCTOR NO.: //5 - 91.2 pef~ 28.0% moisture
#6 - 88.0 pef@ 30.4% moisture
DISTRIBUTION: Cadence McShane
GDA, Scott MeCreary
Haynes Whaley- Mark Thompson
City of Coppell - Garreth Campbell
PAGE 1 OF 1