Loading...
Gateway BP(2.1)-LR 981026 (3) [.glaeering Ge. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 Mr. Robert McCann Project No.: 1598-0007 Catellus Development Corp. Project: Lucent Technologies I 4545 Fuller Dr., Suite 100 Location: North Parking Area Subgrade Irving, Texas 75038 Report No.: 129/8291 RESULTS OF FIELD DENSITY TESTS TEST DATE RETEST TEST LOCATION LIFT/ PROCTOR FIELD Frg. T.r~ PEKCE~'r .NO. OF DEPTH TEST DENSITY MOISTURE OF TEST NO. PCF % SPECIFIED N-D-MBER CO.%fl~AC'TIOI~ 129 10/26/98 50' N X 20' E of NW Comer of Bldg. Final 2 83.9 31.8 95.3 127 10/26/98 30' N X 90' E of NW Comer of Bldg. Final 1 92.0 28.0 100.9 128 10/26/98 70' N X 210' E of NW Comer of Bldg Final 1 88.6 28.1 97.1 129 10/26/98 70' N X 35' W of NE Comer of Bldg. Final I 91.4 28.0 100.2 TESTS PERFORMED BY: R. Mannette TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 2937 REMARKS: SPECIFICATIONS: 95% compaction ~ -2 to +2% moisture PROCTOR NO.: #1 - 91.2 pef~ 28.0% moisture #2 - 98.0 pcf(~ 30.4% moisture DISTRIBUTION: Cadence McShane GDA, Scott McCrea~y Haynes Whaley- Mark Thompson City of Coppell - Garreth Campbell PAGE 1 OF I