Loading...
Gateway BP(1.3)-LR 990308REPORTED TO: £NVIRONMI REPORT OF LABORATORY COMPACTION TE~ Gateway Business Center Freeport Parkway Coppell, Texas Catellus Development Corporation 4545 Fuller Drive, Suite 100 Irving, Texas 75038 ATTN: Mr. Robert McCann CONTRACTOR: Pacific Builders, Inc. GEOTECHNICAL AND [~ F=~ r"'l JJ F~ NTAL CONSULTANTS ;1 REPORT NO. 2 REPORT DATE REG PROJEC1 SAMPLE DATE :0 03_08_99 'NO. 5167 02-10-99 Dark gray clay (lime- 26.0 89.5 4 treated) ASTM D-698 89.5 89.0 88.5 88.0 87.5 87.0 86.5 86.0 85.5 85.0 22.0 Distribution: (1) (1) (1) (1) (1) (1) (1) (1) 24.0 26.0 28.0 30.0 Moisture Content (%) Catellus Development Corp/ Mr. Robert McCann Pacific Builders, Inc./ Mr. ,Jim Kinder Potters Concrete/ Mr. Daniel Lewis AECC, Inc./Mr. Matt Rader Gromatzky Dupree & Associates/ Mr. Scott McCrary Brockette*Davis*Drake/ Mr. Bob Williams City of Coppell/Mr. Larry Davis City of Coppell/Mr. Lee Stone 32.0 Submitted by: REED ENGINEE Original Signed Ronald F. Reed, RFR/cdl RING GROUP, INC. By P.E. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX75235 · TEL[214] 350 5600 · FAX[214] ~50 0019