Gateway BP(1.3)-LR 990308REPORTED TO:
£NVIRONMI
REPORT OF LABORATORY COMPACTION TE~
Gateway Business Center
Freeport Parkway
Coppell, Texas
Catellus Development Corporation
4545 Fuller Drive, Suite 100
Irving, Texas 75038
ATTN: Mr. Robert McCann
CONTRACTOR: Pacific Builders, Inc.
GEOTECHNICAL AND [~ F=~ r"'l JJ F~
NTAL CONSULTANTS
;1
REPORT NO. 2
REPORT DATE
REG PROJEC1
SAMPLE DATE
:0 03_08_99
'NO. 5167
02-10-99
Dark gray clay (lime- 26.0 89.5
4 treated) ASTM D-698
89.5
89.0
88.5
88.0
87.5
87.0
86.5
86.0
85.5
85.0
22.0
Distribution: (1)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
24.0 26.0 28.0 30.0
Moisture Content (%)
Catellus Development Corp/
Mr. Robert McCann
Pacific Builders, Inc./
Mr. ,Jim Kinder
Potters Concrete/
Mr. Daniel Lewis
AECC, Inc./Mr. Matt Rader
Gromatzky Dupree & Associates/
Mr. Scott McCrary
Brockette*Davis*Drake/
Mr. Bob Williams
City of Coppell/Mr. Larry Davis
City of Coppell/Mr. Lee Stone
32.0
Submitted by:
REED ENGINEE
Original Signed
Ronald F. Reed,
RFR/cdl
RING GROUP, INC.
By
P.E.
2424 STUTZ DR. · SUITE 400 · DALLAS, TX75235 · TEL[214] 350 5600 · FAX[214] ~50 0019