Loading...
Gateway BP(2.5)-LR 990203 Fo BuiM On Engineering · Consulting · Testing REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: ALAN GRIMES PROJECT: ROGERS O'BRIEN CONSTRUCTION 11145 MORRISON LANE DALLAS, TX 75229 G & K LALTNDRY PROCESSING DATE: February 03, 1999 OUR REPORT NO.: 337-80080-98 FIELD DATA: Concrete was a 3000 psi mix delivered by LATTIMORE. NO. OF CONCRETE TEMPE~TURE, SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP, IN CONTENT. % AIR CONCRETE__ 147 4 6089448 06:30 am 06:45 am 80.0 4 2.0 45 58 148 4 608455 06:45 am 07:30 am 150.0 5 2.3 50 60 149 4 608463 08:00 am 08:10 am 210.0 4 1/2 2.0 52 64 LOCATION: BUILDING PAD 147 10' EAST & 5' NORTH FROM SOUTHWEST CORNER OF BUILDING 148 100' EAST & 15' NORTH FROM SOUTHWEST CORNER OF BUILDING 149 50' EAST & 40' NORTH FROM SOUTHWEST CORNER OF BUILDING NOTE: APPLICABLE ASIM STANDARDS, UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31-~;'SLUMP: C143-~a;AIR CONTENT: C231-97; ~MPE~TURE: C10~3) REMARKS: Observed the placement of 300.0 cubic yards of concrete. TECHNICIAN: M. HERNANDEZ cc: (1) ROGERS O'BRIEN (1) HALFF ASSOCIATES, INC. (1) CITY OF COPPELL Attn:GARRETH CAMPBELL THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INOICATIVE OF THE ENTIRE CONCRETE PLACEMENT. REPORTS MAY NOT BE REPROOUCED, EXCEPT IN FULL, WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES. INC. Respectfully submitted, Professional Service Industries, Inc. Professional Service Industries, Inc. · 2556 Gravel Drive · Fort Worth, TX 76118 ° Phone 817/284-3783 · Fax 817/284-8942 PSI A.200-1 (3)F