Loading...
WA9302-LR 960529'EOTECH~ICAL From: GEE Consultants, Inc. To: Ken Griffin May 29, 1996 EJ NViRONMENTAL 10046 Monroe Drive · Dallas, Texas 75229 · (2t4) 352-5433 · Fax (214) 352-6972 FAX TRANSMITTAI, SHEET T.: /4'/. Froin: --~---~'F~' ~Q~/./.,¢r~7,~'S//~ Phone/Fax: ~ ~ ~~ g oi' Pages (Including Cover Sheet): Date: , ~- j ~- ~ .. Message: In ll)ropcrty designed and/or constructed portland cement concrele pavement joinIs arc a COalmOll reason for pavement distress. D,;sign mid construction sl~ould include the following: Joint depth should bc equal to 'A of the pavement thickness. l-land-formed joints should have a maximum edge radius of aA inch. Sawing of.joints shotrid begin as soon as the concrete has hm'dencd sufficiently Io permit sawing winrout excessive ravelling. All joints should be completed beeore uncontrolled shrinkage cracking occurs. Joints should be cOntinuOus across the pave~nent unless interrupted by fuIl-dcpfl~ pre-molded joint filler, and sllould extend completely Ihrough fl~e curb. J¢,int openings widcr that ~ inch should bc cleaned and sealed before opening pavement areas to traffic. Expansion joints o1' isolation joints should be used re> isolate fixed objects abutting or winfin ~xe paved a~a. They should contain pro molded joint filler rot' the full dcpth of tl~e stab and should be scaled prior to o~mng to uaffic. Utilization of an integral curb is recommended. CONFIDENT1ALITy NOTICE: TIffs tatsimile contains confidential informatitn~ which may also be legally privileged and which is maende~l l~a' t[Ic use of the Addre.~scc(s) alanrod above. If you are n-I file intended recipient. or Ihc eml~foyee or agent responsible for delivering it to the huehalted recipient, you arc hereby nmificd thai any dissemination or copying of tlais thesimile, or due ~king of any ac6on in tcH:,nce am the ctmlcnt~ of thi~ Iclccopicd in/~rnaation. may be sta ict~y prohibited. If y~pu llav~ received finis facsimile ill error, please notify us hmn~dialely by telephone aztd rcttu'n fi~c entire facsimile k~ tas ul the ahove address via U.S. Poslal Service. ~O'd ~ DNI SIN~I~SNO3 339 O~ :S~ 966~-6E-~W v ' GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 INVOICE J To: Mr. Ken Griffin Invoice No,: 5196-8 City of Coppell Invoice Date: March 29, 1996 P-O- Box 478 Coppell, Texas 75019 214-304-3679 214-304-3570/f ProjecT: Field and Laboratory Testing Performed March, 1996 6.0 MG Ground Water Storage Tank Coppell, Texas Terms: Due Upon Receipt Date of Smnpling Description Q-antity Rate Total 02-28-96 Pan-time Shotcrete Inspection, Regular 4.0 hrs $29,75 $119.00 time rate 02-28-96 Technician Time to Cut 6 Cores 3.0 hrs $29.75 $89.25 02-28-96 Diameter - Inches of Shotcrete Coring 63.3 ea $2.00 $126.60 02-28-96 Capping and Testing Shotcrete Cores 6 ea $17.50 $105.00 02-28-96 Trip Charge 1 ea $12.50 $D.S0 02-29-96 Pick-up Shotcrete Panel (without 2.0 hrs $29.75 $59.50 inspection) 02-29-96 Technician Time to Cut 6 Cores 3.0 hrs $29.75 $89.25 02-29-96 Diameter - Inches of Shotcrete Coring 632 ea $2.00 $126.40 02-29-96 Capping and Testing Shotcrete Cores 6 ea $17.50 $105-00 02-29-96 Trip Charge Iea $12.50 $12.50 ~O'd S 3NI SINVLq~SNO3 339 II:SI 966I-6a-A~W Da~e of , ~ Sampling ' Description Quantity Rate To~al 03-22-96 Shotcrete Mix Inspection, Regular time 4.0 hrs $29.75 $119.00 03-22-96 Technician to Cut 6 Cores 3.0 hrs $29.75 $89.25 03-22-96 Diameter - Inches of Shotcrete Coring 64.5 ea $2-00 $129.00 03-22-96 Capping and Testing Shotcrete 6 ea $17.50 $105.00 03-22-96 Trip Charge 1 ea $12.50 $12.50 Please Pay $1,299.75 November 1995 Proposal No. 051004 Estimated Total $26,447.38 Total Billed to Date $24,714.29 Estimated Remaining Testing $1,000.00 cc: Mr. Gary Hendricks - Shimek, Jacobs and Finklea GEE Consultants, Inc. Invoice N6~ 0S196-8 Coppel! Water Tank Page 2 of 2 £0 'd ~ DNI SINt~I'lr]SNO3 ~ ~ :~T