Loading...
Gateway BP(2.5)-LR 981229 Information l iTo BuiM On Engineering * Consulting · Testing REPORT OF FIELD INSPECTION OF CONCRETE TESTED FOR: ALAN GRIMES ROGERS O'BRIEN CONSTRUCTION 11145 MORRISON LANE DALLAS, TX 75229 PROJECT: G & K LAUlqDRY PROCESSING DATE: December 29, 1998 OUR REPORT NO.: 337-80080-66 FIELD DATA: Concrete was a 4000 psi mix delivered by LATTIMORE, mix number 42. TEMPERATURE. NO. OF CONCRETE SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP, IN CONTENT, % AIR CONCRETE 1135 4 7063254 03:28 am 04:10 am 10.0 3 1/4 37 50 1136 4 7063262 04:13 am 05:30 am 10.0 5 39 53 1137 4 7063280 08:06 am 09:00 am 10.0 5 1/4 39 54 1138 4 7063291 09:05 am 09:55 am 10.0 4 48 53 1139 3 6086747 11:35 am 12:30 pm 10.0 5 55 57 _OCATION: EAST SIDE PAVING 1135 LEFT END APPROACH 1136 LEFT END, 40' 1137 MIDDLE SECTION 1138 RIGHT END, 30' 1139 RIGHT END, 5' __ NOTE: APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31-96; SLUMP: C143-~a;AIR CONTENT: C231-97; IEMPERATUKE: C10~(93) REMARKS: Observed the placement of 560.0 cubic yards of concrete. NOTE: SET ~1139, ONLY 3 CYLINDERS WERE MADE TECHNICIAN: R. BURTSELL cc: (1) ROGERS O'BRIEN (1) HALFF ASSOCIATES, INC. (1) CITY OF COPPELL Attn:GARRETH CAMPBELL THESE TEST RE~LTS APPLY ~LY TO THE SPE~FIC ~LES TESTED AND MY NOT BE INDI~TIVE ~ THE ENTIRE C~CRETE PLACEMENT. REPOTS ~¥ NOT BE REPROOUCED, EXCEPT IN FULL. WlTH~T ~I~EN PERMISSI~ BY PR~ESSI~AL SERVI~ INDUSTRIES, INC. Respectfully submitted, Professional Service Industries, Inc. PSIA-200-1 (3)F Professional Service Industries, Inc. · 2556 Gravel Drive ° Fort Worth, TX 76118 ° Phone 817/284-3783 · Fax 817/284-8942