Gateway BP(2.5)-LR 981229 Information
l iTo BuiM On
Engineering * Consulting · Testing
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR:
ALAN GRIMES
ROGERS O'BRIEN CONSTRUCTION
11145 MORRISON LANE
DALLAS, TX 75229
PROJECT:
G & K LAUlqDRY PROCESSING
DATE:
December 29, 1998
OUR REPORT NO.: 337-80080-66
FIELD DATA: Concrete was a 4000 psi mix delivered by LATTIMORE,
mix number 42.
TEMPERATURE.
NO. OF CONCRETE
SPECIMENS SUPPLIER TIME TRUCK TIME TRUCK YARDS OF AIR
SET NO. MADE TICKET NUMBER DISPATCHED UNLOADED CONCRETE SLUMP, IN CONTENT, % AIR CONCRETE
1135 4 7063254 03:28 am 04:10 am 10.0 3 1/4 37 50
1136 4 7063262 04:13 am 05:30 am 10.0 5 39 53
1137 4 7063280 08:06 am 09:00 am 10.0 5 1/4 39 54
1138 4 7063291 09:05 am 09:55 am 10.0 4 48 53
1139 3 6086747 11:35 am 12:30 pm 10.0 5 55 57
_OCATION: EAST SIDE PAVING
1135 LEFT END APPROACH
1136 LEFT END, 40'
1137 MIDDLE SECTION
1138 RIGHT END, 30'
1139 RIGHT END, 5' __
NOTE: APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31-96; SLUMP: C143-~a;AIR CONTENT: C231-97; IEMPERATUKE: C10~(93)
REMARKS: Observed the placement of 560.0 cubic yards of concrete.
NOTE: SET ~1139, ONLY 3 CYLINDERS WERE MADE
TECHNICIAN: R. BURTSELL
cc: (1) ROGERS O'BRIEN (1) HALFF ASSOCIATES, INC.
(1) CITY OF COPPELL Attn:GARRETH CAMPBELL
THESE TEST RE~LTS APPLY ~LY TO THE SPE~FIC ~LES TESTED AND MY NOT BE INDI~TIVE ~ THE ENTIRE C~CRETE PLACEMENT.
REPOTS ~¥ NOT BE REPROOUCED, EXCEPT IN FULL. WlTH~T ~I~EN PERMISSI~ BY PR~ESSI~AL SERVI~ INDUSTRIES, INC.
Respectfully submitted,
Professional Service Industries, Inc.
PSIA-200-1 (3)F Professional Service Industries, Inc. · 2556 Gravel Drive ° Fort Worth, TX 76118 ° Phone 817/284-3783 · Fax 817/284-8942